The Acquisition Dictionary

Acquisition terms explained by people who’ve actually signed one — from J&A to IGCE, current with the FAR overhaul.

Browse by category

All terms

Documents & Artifacts

Processes & Methods

Regulations & Policy

Contract Types & Vehicles

Programs & Pathways

8(a) Business Development Program

The 8(a) Business Development Program, authorized by Section 8(a) of the Small Business Act, gives SBA-certified firms owned by socially and economically disadvantaged individuals a nine-year term of access to sole-source and competitive set-aside federal contracts under 13 CFR Part 124.

The 8(a) Business Development Program, authorized by Section 8(a) of the Small Business Act, gives SBA-certified firms owned by socially and economically disadvantaged individuals a nine-year term of access to sole-source and competitive set-aside federal contracts under 13 CFR Part 124.

The Part 19 model deviation reorganizes small business coverage into lifecycle subparts and lets an incumbent 8(a) requirement release automatically when the follow-on is set aside for another socioeconomic program; Part 19 is not in the June 2026 first-batch proposed rules, so published subpart 19.8 still controls absent an agency deviation.

Adaptive Acquisition Framework (AAF)

The Adaptive Acquisition Framework (AAF) is DoD's acquisition structure under DoDI 5000.02: six pathways (urgent capability, middle tier, major capability, software, defense business systems, and services), each governed by its own instruction and picked to fit what is being bought.

The Adaptive Acquisition Framework (AAF) is DoD's acquisition structure under DoDI 5000.02: six pathways (urgent capability, middle tier, major capability, software, defense business systems, and services), each governed by its own instruction and picked to fit what is being bought.

The AAF is DoD policy issued under title 10 authorities rather than FAR text, so the FAR Overhaul's model deviations leave it intact; DoD's companion DFARS class deviations, issued December 2025 through March 2026, rewrite contracting regulation, not pathway policy.

Administrative Contracting Officer vs. Procuring Contracting Officer (ACO vs. PCO)

The procuring contracting officer (PCO) awards the contract and keeps every function not delegated; the administrative contracting officer (ACO) performs the postaward functions FAR 42.302 assigns, working from a contract administration office (in DoD, DCMA). FAR 2.101 defines the ACO; PCO is shorthand, not a FAR-defined term.

The procuring contracting officer (PCO) awards the contract and keeps every function not delegated; the administrative contracting officer (ACO) performs the postaward functions FAR 42.302 assigns, working from a contract administration office (in DoD, DCMA). FAR 2.101 defines the ACO; PCO is shorthand, not a FAR-defined term.

The Part 42 model deviation keeps the 42.202 delegation mechanics and the full 42.302 function lists, adding text that the contracting officer may retain any paragraph (a) function except the four reserved to the cognizant Federal agency (forward pricing rate agreements, final indirect cost rates, Cost Accounting Standards administration, and accounting system adequacy); DoD adopted the model text with DFARS 242 through class deviation 2026-O0050 effective March 6, 2026, and Part 42 was not among the parts in the four proposed rules published June 23, 2026.

Anti-Deficiency Act (ADA)

The Anti-Deficiency Act, 31 U.S.C. 1341, 1342, and 1517, bars federal employees from obligating or spending in excess or in advance of an appropriation or apportionment, and from accepting voluntary services. Violations must be reported to the President and Congress.

The Anti-Deficiency Act, 31 U.S.C. 1341, 1342, and 1517, bars federal employees from obligating or spending in excess or in advance of an appropriation or apportionment, and from accepting voluntary services. Violations must be reported to the President and Congress.

No direct impact: the Act lives in title 31, outside the FAR. The companion funds-availability coverage in FAR Part 32 survives the overhaul — GSA class deviation RFO-2025-32 (issued October 7, 2025, effective November 3, 2025) leaves subpart 32.7 in place — and Part 32 is not among the June 23, 2026 first-batch proposed rules. (verified September 14, 2026)

Assisted Acquisition

An assisted acquisition is an interagency acquisition in which a servicing agency awards and administers a contract or order on a requesting agency's behalf under FAR Subpart 17.5, governed by a written interagency agreement signed before the solicitation issues.

An assisted acquisition is an interagency acquisition in which a servicing agency awards and administers a contract or order on a requesting agency's behalf under FAR Subpart 17.5, governed by a written interagency agreement signed before the solicitation issues.

The Part 17 model deviation (posted September 11, 2025) retains subpart 17.5's interagency machinery with plain-language edits. GSA adopted it through class deviation RFO-2025-17, effective November 3, 2025, and DoD followed with class deviation 2026-O0027 (December 18, 2025) revising DFARS 217. Part 17 is not among the four first-batch proposed rules published June 23, 2026, so published FAR Subpart 17.5 remains the citation absent an agency deviation. (verified September 30, 2026)

Authority to Operate (ATO)

An Authority to Operate (ATO) is a senior official's formal decision to accept the security risk of running an information system, reached through the Risk Management Framework in NIST SP 800-37. Federal systems need one before processing live data, and keeping one is continuous work.

An Authority to Operate (ATO) is a senior official's formal decision to accept the security risk of running an information system, reached through the Risk Management Framework in NIST SP 800-37. Federal systems need one before processing live data, and keeping one is continuous work.

System authorization lives in FISMA, OMB policy, and NIST and DoD issuances rather than the FAR, so the overhaul does not reach it; the June 2026 proposed rule (FAR Case 2026-001) consolidates the FAR's information-security clauses into Part 40 without touching the ATO process.

Basic Ordering Agreement (BOA)

A basic ordering agreement (BOA) is a written instrument of understanding, not a contract, that sets the terms, a description of anticipated supplies or services, and the pricing and ordering methods that will govern future orders. FAR 16.703 governs.

A basic ordering agreement (BOA) is a written instrument of understanding, not a contract, that sets the terms, a description of anticipated supplies or services, and the pricing and ordering methods that will govern future orders. FAR 16.703 governs.

The Part 16 model deviation (posted September 30, 2025) retains agreements in subpart 16.7, restructuring basic ordering agreement coverage into sections 16.703-1 through 16.703-3; DoD adopted the deviated part through class deviation 2026-O0045 (effective March 16, 2026). Part 16 is not among the June 23, 2026 first-batch proposed rules, so published 16.703 remains the baseline absent an agency deviation. (verified September 22, 2026)

Berry Amendment

The Berry Amendment, 10 U.S.C. 4862, bars DoD from using appropriated funds to buy food, clothing, tents, cotton and other natural or synthetic fabrics, or hand or measuring tools unless the items are entirely grown, reprocessed, reused, or produced in the United States.

The Berry Amendment, 10 U.S.C. 4862, bars DoD from using appropriated funds to buy food, clothing, tents, cotton and other natural or synthetic fabrics, or hand or measuring tools unless the items are entirely grown, reprocessed, reused, or produced in the United States.

The Berry Amendment sits in statute and the DFARS, outside the FAR, so the overhaul does not rewrite it; DoD's Part 25/225 class deviation 2026-O0041 (effective February 3, 2026) restructures FAR-level foreign acquisition coverage while the DFARS 225.7002 restrictions and clause 252.225-7012 continue to apply, and Part 25 appears in neither the June 23, 2026 first-batch proposed rules nor the September 18, 2026 second batch. (verified September 18, 2026)

Best-Value Tradeoff

The best-value tradeoff process permits award to other than the lowest-priced or highest-rated offeror when the source selection authority documents that the superior proposal's benefits are worth its price premium, or that a cheaper proposal's savings outweigh its weaknesses.

The best-value tradeoff process permits award to other than the lowest-priced or highest-rated offeror when the source selection authority documents that the superior proposal's benefits are worth its price premium, or that a cheaper proposal's savings outweigh its weaknesses.

The Part 15 model deviation (RFO-2025-15, issued September 30, 2025, adopted by agencies beginning November 3, 2025) collapses Part 15 into five subparts and adds a highest-technically-rated-with-a-fair-and-reasonable-price evaluation approach alongside tradeoff; the tradeoff authority itself is statutory. Part 15 is not in the June 2026 first-batch proposed rules, so published 15.101-1 remains the baseline absent an agency deviation. (verified September 12, 2026)

Bid Protest (GAO)

A GAO bid protest is a written objection by an interested party to a solicitation or award, filed with the Government Accountability Office under CICA, 31 U.S.C. 3551-3557. Timely filing triggers an automatic stay, and GAO must decide within 100 days.

A GAO bid protest is a written objection by an interested party to a solicitation or award, filed with the Government Accountability Office under CICA, 31 U.S.C. 3551-3557. Timely filing triggers an automatic stay, and GAO must decide within 100 days.

The Part 33 model deviation rebuilds agency protests at 33.104-4 with a 35-day best-effort resolution target and restates the stay at 33.105-3, and Part 33 is in the June 23, 2026 first-batch proposed rules, which drop the FAR's restatement of GAO procedure in favor of a pointer to 4 CFR part 21.

Bridge Contract

A bridge contract is a short-term, usually sole-source extension or stopgap award — generally to the incumbent — that keeps services running when the follow-on contract is not awarded before the current one ends. The FAR never defines the term; GAO and agency supplements do.

A bridge contract is a short-term, usually sole-source extension or stopgap award — generally to the incumbent — that keeps services running when the follow-on contract is not awarded before the current one ends. The FAR never defines the term; GAO and agency supplements do.

The Overhaul supplies no bridge definition; the mechanics sit in Parts 6 and 17. The Part 6 model deviation and the June 23, 2026 first-batch proposed rule (91 FR 37636, comments closed July 23, 2026) restructure competition coverage without substantive policy change, and DoD adopted deviated Part 6 as class deviation 2026-O0017 (initially issued December 18, 2025). Part 17 is in the September 18, 2026 second-batch proposed rules (91 FR 59476, comments due October 19, 2026), which would rename 52.217-8 the Option to Extend, apply it beyond services, and let the parties toll the exercise window during a lapse in appropriations. (verified September 28, 2026)

Broad Agency Announcement (BAA)

A Broad Agency Announcement (BAA) is a general solicitation under FAR 35.016 for basic and applied research, announcing areas of research interest rather than a work statement; awards follow peer or scientific review and qualify as competitive procedures under FAR 6.102(d)(2).

A Broad Agency Announcement (BAA) is a general solicitation under FAR 35.016 for basic and applied research, announcing areas of research interest rather than a work statement; awards follow peer or scientific review and qualify as competitive procedures under FAR 6.102(d)(2).

The Part 35 model deviation (RFO-2025-35, issued July 2025) keeps BAA procedures substantively intact, relocating them from 35.016 to 35.102 with plain-language edits.

Buy American Act (BAA)

The Buy American Act (41 U.S.C. chapter 83) establishes a price preference for domestic end products in federal procurement for use inside the United States, applied through FAR Part 25 using a two-part test: U.S. manufacture plus minimum domestic component content.

The Buy American Act (41 U.S.C. chapter 83) establishes a price preference for domestic end products in federal procurement for use inside the United States, applied through FAR Part 25 using a two-part test: U.S. manufacture plus minimum domestic component content.

The RFO Part 25 model deviation keeps Buy American supplies policy in subpart 25.1 with the graduated content thresholds intact and adds a MadeinAmerica.gov waiver-portal step for nonavailability determinations, so confirm section numbers against your agency's class deviation.

Certificate of Competency (COC)

A Certificate of Competency (COC) is the SBA's certification, under 15 U.S.C. 637(b)(7), that a small business a contracting officer found nonresponsible can in fact perform a specific government contract. Once issued, it is conclusive, and the contracting officer must award.

A Certificate of Competency (COC) is the SBA's certification, under 15 U.S.C. 637(b)(7), that a small business a contracting officer found nonresponsible can in fact perform a specific government contract. Once issued, it is conclusive, and the contracting officer must award.

The Part 19 model deviation rebuilds Small Business around the acquisition lifecycle and folds subpart 19.6 into new section 19.204, with the referral mechanics intact. GSA adopted it as class deviation RFO-2025-19 (issued September 26, 2025, effective November 3, 2025) and DoD through class deviation 2026-O0037 (issued January 21, 2026); Part 19 is not among the June 23, 2026 first-batch proposed rules. (verified October 1, 2026)

Certified Cost or Pricing Data (TINA)

Certified cost or pricing data are the facts contractors must submit and certify as accurate, complete, and current for negotiated actions above the FAR 15.403-4 threshold — $2.5 million, or $10 million for DoD contracts entered into after June 30, 2026 — unless an exception applies.

Certified cost or pricing data are the facts contractors must submit and certify as accurate, complete, and current for negotiated actions above the FAR 15.403-4 threshold — $2.5 million, or $10 million for DoD contracts entered into after June 30, 2026 — unless an exception applies.

The Part 15 model deviation restructures subpart 15.4 but keeps the certified cost or pricing data clauses substantively intact; the bigger change is statutory — Pub. L. 119-60 moved the DoD threshold to $10 million effective June 30, 2026, ahead of conforming FAR text, so check current agency guidance before citing a number.

Changes Clause (FAR 52.243)

The Changes clause lets the contracting officer unilaterally order changes within the general scope of a contract — to drawings, specifications, method of shipment, or place of delivery — while obligating the contractor to keep performing. The contractor's remedy is an equitable adjustment under FAR 52.243-1 through 52.243-5.

The Changes clause lets the contracting officer unilaterally order changes within the general scope of a contract — to drawings, specifications, method of shipment, or place of delivery — while obligating the contractor to keep performing. The contractor's remedy is an equitable adjustment under FAR 52.243-1 through 52.243-5.

The Part 43 model deviation, adopted at GSA as class deviation RFO-2025-43 (issued June 9, 2025, effective on issuance), trims about 300 words of non-statutory text while keeping the change-order framework intact; the Changes clauses themselves sit in Part 52, and Part 43 is not among the June 23, 2026 first-batch proposed rules. (verified September 16, 2026)

Class Deviation

A class deviation authorizes an agency to depart from specific FAR or supplement provisions for a category of contract actions rather than a single case — the mechanism agencies are using to implement the Revolutionary FAR Overhaul ahead of formal rulemaking.

A class deviation authorizes an agency to depart from specific FAR or supplement provisions for a category of contract actions rather than a single case — the mechanism agencies are using to implement the Revolutionary FAR Overhaul ahead of formal rulemaking.

Class deviations ARE the current RFO implementation vehicle; DoD maintains parallel DFARS class deviations. This entry's subject is the mechanism itself.

Colors of Money

Colors of money is the practitioner term for appropriation categories such as O&M, procurement, RDT&E, military personnel, and military construction, each legally usable only for its stated purpose, within a fixed period, and up to a fixed amount under 31 U.S.C. 1301, 1502, and 1341.

Colors of money is the practitioner term for appropriation categories such as O&M, procurement, RDT&E, military personnel, and military construction, each legally usable only for its stated purpose, within a fixed period, and up to a fixed amount under 31 U.S.C. 1301, 1502, and 1341.

No impact: appropriations law sits in title 31 and the annual appropriations acts, outside the FAR, so neither the model deviations nor the 2026 proposed rules change how funds are colored, timed, or limited.

Commercial and Government Entity (CAGE) Code

A CAGE code is the identifier the Defense Logistics Agency assigns to a specific entity location doing business with the federal government. FAR 4.1802 requires offerors to provide one before award of any action above the micro-purchase threshold that requires SAM registration or a unique entity identifier.

A CAGE code is the identifier the Defense Logistics Agency assigns to a specific entity location doing business with the federal government. FAR 4.1802 requires offerors to provide one before award of any action above the micro-purchase threshold that requires SAM registration or a unique entity identifier.

The Part 4 model deviation moves CAGE policy under contractor identification at 4.305, keeping the life-of-contract maintenance duty and the 30-day change report, and Part 4 is in the June 23, 2026 proposed rule, which folds CAGE collection into a consolidated offeror-identification provision.

Commercial Products and Services (FAR Part 12)

Commercial products and commercial services are items of a type sold, leased, licensed, or offered in the commercial marketplace, defined at FAR 2.101. FAR Part 12 implements the statutory preference for buying them whenever market research shows they can meet the agency's need.

Commercial products and commercial services are items of a type sold, leased, licensed, or offered in the commercial marketplace, defined at FAR 2.101. FAR Part 12 implements the statutory preference for buying them whenever market research shows they can meet the agency's need.

The Part 12 model deviation (adopted by agencies through class deviations in fall 2025) rebuilds the part around presolicitation, solicitation and award, postaward, and micro-purchase subparts and strips dozens of clause requirements; Part 12 is not in the June 2026 first-batch proposed rules, so the published text remains the baseline absent an agency deviation.

Commercial Solutions Opening (CSO)

A Commercial Solutions Opening (CSO) is a competitive procedure under 10 U.S.C. 3458 by which DoD awards fixed-price contracts for innovative commercial products or services through a general solicitation and peer, technical, or operational review, implemented at DFARS subpart 212.70.

A Commercial Solutions Opening (CSO) is a competitive procedure under 10 U.S.C. 3458 by which DoD awards fixed-price contracts for innovative commercial products or services through a general solicitation and peer, technical, or operational review, implemented at DFARS subpart 212.70.

CSO authority is statutory and implemented in DFARS subpart 212.70, which the FAR Overhaul model deviations do not rewrite; DoD's Part 12 deviation carries forward the commercial framework a CSO award rides on.

Competitive Range Determination

A competitive range determination is the contracting officer's decision under FAR 15.306(c), after initial evaluation, on which proposals stay in a negotiated procurement for discussions: all of the most highly rated proposals, unless the solicitation allowed narrowing the range for efficiency.

A competitive range determination is the contracting officer's decision under FAR 15.306(c), after initial evaluation, on which proposals stay in a negotiated procurement for discussions: all of the most highly rated proposals, unless the solicitation allowed narrowing the range for efficiency.

The Part 15 model deviation (posted September 30, 2025; GSA adopted it as class deviation RFO-2025-15 effective November 3, 2025) recasts the determination at 15.204-1, defining the competitive range as the group of evaluated proposals best suited for further negotiation (dropping the all-of-the-most-highly-rated standard) and replacing discussions with negotiations throughout; exclusion notices move to 15.206-1(a). Part 15 is not among the June 23, 2026 first-batch proposed rules, so published 15.306(c) remains the baseline absent an agency deviation. (verified September 22, 2026)

Consolidation and Bundling

Consolidation combines requirements previously bought under separate smaller contracts into one acquisition; bundling is consolidation that makes the result unsuitable for small business award. FAR 7.107 requires a written determination above $2 million for consolidation and measurably substantial benefits for bundling.

Consolidation combines requirements previously bought under separate smaller contracts into one acquisition; bundling is consolidation that makes the result unsuitable for small business award. FAR 7.107 requires a written determination above $2 million for consolidation and measurably substantial benefits for bundling.

The Part 7 model deviation (posted September 4, 2025) keeps 7.107 but collapses the separate consolidation, bundling, and substantial-bundling procedures into one standardized analysis, determination, and notification sequence, retaining the market-research predicate; GSA adopted it as class deviation RFO-2025-07 effective November 3, 2025, and DoD as class deviation 2026-O0020 (issued December 18, 2025). Part 7 is in the June 23, 2026 first-batch proposed rules (FAR case 2026-002, covering parts 6, 7, 10, 18, 26, 37, and 41), which carries the unified 7.107 forward; comments closed July 23, 2026. (verified September 25, 2026)

Constructive Change

A constructive change is Government conduct — defective specifications, informal direction, acceleration after excusable delay, or a disputed contract interpretation — that requires work beyond the contract without a written change order, entitling the contractor to an equitable adjustment under the Changes clause.

A constructive change is Government conduct — defective specifications, informal direction, acceleration after excusable delay, or a disputed contract interpretation — that requires work beyond the contract without a written change order, entitling the contractor to an equitable adjustment under the Changes clause.

The Part 43 model deviation streamlines contract-modification coverage without substantive change to changes-clause mechanics; GSA adopted it through class deviation RFO-2025-43 (June 9, 2025) and DoD through class deviation 2026-O0034 (January 12, 2026), covering DFARS 243. Part 43 is not among the first-batch proposed rules published June 23, 2026 (beginning at 91 FR 37550), so published FAR 43.104 and the 52.243 clauses remain the citations absent an agency deviation. (verified October 5, 2026)

Continuing Resolution (CR)

A continuing resolution is a stopgap appropriations act that keeps agencies operating after regular appropriations lapse, funding existing activities at a prior-year rate for operations, generally barring new starts, until full-year appropriations pass or the CR expires.

A continuing resolution is a stopgap appropriations act that keeps agencies operating after regular appropriations lapse, funding existing activities at a prior-year rate for operations, generally barring new starts, until full-year appropriations pass or the CR expires.

The Part 32 model deviation keeps the funds-availability rules at FAR 32.703-2 and 32.703-3 in regulation, so CR-driven contracting mechanics carry through the overhaul unchanged.

Contract Closeout

Contract closeout is the administrative wind-down of a physically complete federal contract: final payment, settlement of indirect cost rates where required, deobligation of excess funds, and closure of the file on the FAR 4.804-1 clocks — six months firm-fixed-price, 36 months where rates must settle.

Contract closeout is the administrative wind-down of a physically complete federal contract: final payment, settlement of indirect cost rates where required, deobligation of excess funds, and closure of the file on the FAR 4.804-1 clocks — six months firm-fixed-price, 36 months where rates must settle.

The Part 4 model deviation, adopted at GSA as class deviation RFO-2025-04 (issued August 13, 2025, effective November 3, 2025), moves closeout from 4.804 and 4.805 to 4.308 and 4.309 in its postaward subpart; Part 4 is in the June 23, 2026 first-batch proposed rules, which relocate contract-file contents and internal procedures to the non-regulatory FAR Companion, and the companion Parts 3 and 49 proposed rule of the same date is aimed in part at accelerating closeout. (verified September 15, 2026)

Contract Data Requirements List (CDRL)

A Contract Data Requirements List (CDRL, DD Form 1423) is the contract exhibit specifying every data deliverable on a DoD contract — each item citing a Data Item Description with format, frequency, and distribution — required by DFARS 215.470 whenever data are ordered.

A Contract Data Requirements List (CDRL, DD Form 1423) is the contract exhibit specifying every data deliverable on a DoD contract — each item citing a Data Item Description with format, frequency, and distribution — required by DFARS 215.470 whenever data are ordered.

The Revolutionary FAR Overhaul model deviations rewrite the FAR itself, so the DD Form 1423 process is not directly changed; agencies are expected to streamline their own supplements, making DoD class deviations and DFARS revisions the channel to watch.

Contract Disputes Act (CDA)

The Contract Disputes Act, 41 U.S.C. 7101-7109, governs claims on federal contracts: a written demand to the contracting officer, certification above $100,000, a final decision on a statutory clock, then appeal to a board of contract appeals or the Court of Federal Claims.

The Contract Disputes Act, 41 U.S.C. 7101-7109, governs claims on federal contracts: a written demand to the contracting officer, certification above $100,000, a final decision on a statutory clock, then appeal to a board of contract appeals or the Court of Federal Claims.

The Part 33 model deviation, adopted at GSA as class deviation RFO-2025-33 (issued August 19, 2025, effective November 3, 2025), consolidates the claims procedures into a single Postaward section at 33.205 and rewrites the disputes clauses in plain language; Part 33 is in the June 23, 2026 first-batch proposed rules, which also revise 52.233-1. (verified September 14, 2026)

Contract Line Item Number (CLIN)

A Contract Line Item Number (CLIN) identifies a separately priced deliverable in a federal contract. FAR subpart 4.10 requires each line item to carry a single unit price, its own delivery schedule, and one accounting classification; DoD numbers them 0001 through 9999.

A Contract Line Item Number (CLIN) identifies a separately priced deliverable in a federal contract. FAR subpart 4.10 requires each line item to carry a single unit price, its own delivery schedule, and one accounting classification; DoD numbers them 0001 through 9999.

The FAR Overhaul model deviation moves line-item policy from subpart 4.10 to section 4.202, and Part 4 is in the June 2026 proposed rule covering Parts 1, 2, 4, 33, 39, 40, and 53; DoD's DFARS numbering scheme is unchanged.

Contract Modification

A contract modification is any written change to the terms of an existing contract, executed on Standard Form 30 under FAR Part 43. Bilateral modifications (supplemental agreements) are signed by both parties; unilateral modifications, such as administrative changes and change orders, are signed only by the contracting officer.

A contract modification is any written change to the terms of an existing contract, executed on Standard Form 30 under FAR Part 43. Bilateral modifications (supplemental agreements) are signed by both parties; unilateral modifications, such as administrative changes and change orders, are signed only by the contracting officer.

The Part 43 model deviation, adopted by agencies through class deviations since June 2025, trims non-statutory text but keeps the structure — the unilateral/bilateral split, SF 30, and change-order definitization survive — and Part 43 is not in the June 2026 first-batch proposed rules.

Contract Option

A contract option is a unilateral government right, priced and evaluated at award, to extend a contract's term or buy additional quantities without a new competition. FAR Subpart 17.2 governs when options may be used and the conditions for exercising them.

A contract option is a unilateral government right, priced and evaluated at award, to extend a contract's term or buy additional quantities without a new competition. FAR Subpart 17.2 governs when options may be used and the conditions for exercising them.

The Part 17 model deviation renumbers options coverage (exercise requirements move to 17.204-1, with skip-evaluation approvals one level above the contracting officer), so check the adopted deviation text before citing legacy 17.2 section numbers.

Contracting Officer (CO)

A contracting officer is the government official with authority to enter into, administer, or terminate contracts and make related determinations and findings, per FAR 2.101 and 1.602-1. Only a contracting officer can bind the government, and only within the limits of the delegated authority.

A contracting officer is the government official with authority to enter into, administer, or terminate contracts and make related determinations and findings, per FAR 2.101 and 1.602-1. Only a contracting officer can bind the government, and only within the limits of the delegated authority.

The Part 1 model deviation moves contracting officer authority and appointment to 1.402 and 1.403 while keeping the SF 1402, and Part 1 is in FAR Case 2026-001, proposed June 23, 2026, so that restructure is now in formal rulemaking; until a final rule, 1.602 and 1.603 control except under an agency deviation.

Contracting Officer's Representative (COR)

A contracting officer's representative is a government employee designated in writing under FAR 1.602-2(d) to monitor contract performance on the contracting officer's behalf. A COR has no authority to make commitments or changes affecting price, quality, quantity, delivery, or other contract terms.

A contracting officer's representative is a government employee designated in writing under FAR 1.602-2(d) to monitor contract performance on the contracting officer's behalf. A COR has no authority to make commitments or changes affecting price, quality, quantity, delivery, or other contract terms.

The June 23, 2026 proposed rule covering Parts 1, 2, 4, 33, 39, 40, and 53 consolidates COR policy into a proposed FAR 1.404; until it finalizes, 1.602-2(d) and 1.604 control except at agencies operating under the Part 1 model deviation.

Contractor Team Arrangement (CTA)

A contractor team arrangement is either a partnership or joint venture formed to act as a potential prime contractor, or a prime contractor's agreement to use designated subcontractors on a specific contract or program — both recognized under FAR subpart 9.6.

A contractor team arrangement is either a partnership or joint venture formed to act as a potential prime contractor, or a prime contractor's agreement to use designated subcontractors on a specific contract or program — both recognized under FAR subpart 9.6.

The Part 9 model deviation (posted August 21, 2025; informal feedback closed October 6, 2025) deletes subpart 9.6 from the deviated text, leaving team arrangements lawful but no longer addressed in regulation; DoD adopted the rewrite through class deviation 2026-O0042 (effective February 17, 2026), covering DFARS 209. Part 9 is in the second batch of proposed rules published September 18, 2026 (FAR Case 2026-011, beginning at 91 FR 59584; comments close October 19, 2026), which likewise proposes removing subpart 9.6 as unnecessary. Until a final rule issues, published FAR 9.601 through 9.604 remain the codified citations — at agencies operating under the deviation, there is no subpart 9.6 to cite. (verified October 6, 2026)

Controlled Unclassified Information (CUI)

Controlled Unclassified Information (CUI) is information the government creates or possesses, or that an entity handles on its behalf, that a law, regulation, or governmentwide policy requires safeguarding or dissemination controls for — sensitive but not classified, governed by 32 CFR Part 2002.

Controlled Unclassified Information (CUI) is information the government creates or possesses, or that an entity handles on its behalf, that a law, regulation, or governmentwide policy requires safeguarding or dissemination controls for — sensitive but not classified, governed by 32 CFR Part 2002.

The June 2026 overhaul proposed rule (FAR Case 2026-001) folds the January 2025 CUI proposed rule into proposed FAR Part 40, standardizes CUI identification on a new form, and relaxes the incident-reporting window from 8 hours to 72; comments closed July 23, 2026.

Cost Accounting Standards (CAS)

Cost Accounting Standards are uniform rules governing how contractors measure, assign, and allocate costs to covered negotiated contracts. The CAS Board issues them at 48 CFR chapter 99; FAR Part 30 governs coverage determinations, Disclosure Statements, and compliance administration on individual contracts.

Cost Accounting Standards are uniform rules governing how contractors measure, assign, and allocate costs to covered negotiated contracts. The CAS Board issues them at 48 CFR chapter 99; FAR Part 30 governs coverage determinations, Disclosure Statements, and compliance administration on individual contracts.

The Part 30 model deviation keeps the subpart structure while pulling cost-impact detail out for separate CAS Board rulemaking, and the changes that bite are outside the FAR: section 1806 of the FY2026 NDAA and the Board's September 1, 2026 final rule move the thresholds to $35 million and $100 million effective October 1, 2026.

Cost Principles (FAR Part 31)

The FAR Part 31 cost principles decide which contractor costs the government will pay: a cost is allowable only if reasonable, allocable, consistent with CAS or GAAP, within the contract's terms, and not limited elsewhere in the subpart. FAR 31.201-2 states the test.

The FAR Part 31 cost principles decide which contractor costs the government will pay: a cost is allowable only if reasonable, allocable, consistent with CAS or GAAP, within the contract's terms, and not limited elsewhere in the subpart. FAR 31.201-2 states the test.

The Part 31 model deviation (posted July 17, 2025) keeps the part's structure and section numbering, cutting more than 1,300 words of non-statutory and redundant language while leaving the 31.201-2 allowability factors and the 31.205 selected costs in place; GSA adopted it as class deviation RFO-2025-31, and DoD as class deviation 2026-O0032 (issued December 18, 2025). Part 31 is not among the June 23, 2026 first-batch proposed rules, so published Part 31 remains the baseline absent an agency deviation. (verified September 24, 2026)

Cost Realism Analysis

Cost realism analysis is the independent review of each offeror's proposed cost elements to determine whether they are realistic for the work, reflect a clear understanding of the requirements, and are consistent with the offeror's own technical approach. FAR 15.404-1(d) governs.

Cost realism analysis is the independent review of each offeror's proposed cost elements to determine whether they are realistic for the work, reflect a clear understanding of the requirements, and are consistent with the offeror's own technical approach. FAR 15.404-1(d) governs.

The Part 15 model deviation (released September 30, 2025) restructures contracting by negotiation and carries cost realism analysis at section 15.404-3; DoD conformed DFARS 215 through class deviation 2026-O0048 (issued March 5, 2026; effective March 16, 2026). Part 15 is not among the June 23, 2026 first-batch proposed rules. (verified September 21, 2026)

Cost-Plus-Award-Fee (CPAF)

A cost-plus-award-fee (CPAF) contract reimburses allowable costs and pays a fee in two parts: a base amount fixed at inception, if any, and an award amount the contractor may earn in whole or in part through periodic government evaluations. FAR 16.405-2 governs.

A cost-plus-award-fee (CPAF) contract reimburses allowable costs and pays a fee in two parts: a base amount fixed at inception, if any, and an award amount the contractor may earn in whole or in part through periodic government evaluations. FAR 16.405-2 governs.

The Part 16 model deviation (released September 30, 2025) consolidates award-fee arrangements at section 16.402, with cost-plus-award-fee at 16.402-4, and new section 16.104 (Executive Order 14402) requires written justification before other-than-fixed-price awards; DoD conformed DFARS 216 through class deviation 2026-O0045 (issued February 20, 2026; effective March 16, 2026). Part 16 is not among the June 23, 2026 first-batch proposed rules. (verified September 21, 2026)

Cost-Plus-Fixed-Fee (CPFF)

A cost-plus-fixed-fee (CPFF) contract reimburses allowable costs and pays a fee negotiated and fixed at inception. The fee does not vary with actual cost, though it may adjust when the work changes. FAR 16.306 governs; statutory caps limit the fee.

A cost-plus-fixed-fee (CPFF) contract reimburses allowable costs and pays a fee negotiated and fixed at inception. The fee does not vary with actual cost, though it may adjust when the work changes. FAR 16.306 governs; statutory caps limit the fee.

The current Part 16 model deviation carries CPFF at section 16.304 in a condensed subpart 16.3, and new section 16.104 (Executive Order 14402) requires written justification — with agency-head approval above set thresholds — before any new cost-reimbursement award.

Cost-Plus-Incentive-Fee (CPIF)

A cost-plus-incentive-fee (CPIF) contract reimburses allowable costs and adjusts the initially negotiated fee by formula, comparing total allowable cost to target cost, within a negotiated minimum and maximum fee. FAR 16.405-1 governs.

A cost-plus-incentive-fee (CPIF) contract reimburses allowable costs and adjusts the initially negotiated fee by formula, comparing total allowable cost to target cost, within a negotiated minimum and maximum fee. FAR 16.405-1 governs.

The Part 16 model deviation (posted September 30, 2025) consolidates CPIF coverage at section 16.405 within a restructured incentive subpart, and new section 16.104 (Executive Order 14402) pulls cost-reimbursement awards into the written-justification regime for other-than-fixed-price contracts; DoD conformed through class deviation 2026-O0045 (effective March 16, 2026). Part 16 is not among the June 23, 2026 first-batch proposed rules, so published 16.405-1 remains the baseline absent an agency deviation. (verified September 22, 2026)

Cure Notice

A cure notice is the written notice FAR 49.402-3 requires before terminating a contract for default on any ground other than late delivery, specifying the failure and giving the contractor at least 10 days to cure it before termination may proceed.

A cure notice is the written notice FAR 49.402-3 requires before terminating a contract for default on any ground other than late delivery, specifying the failure and giving the contractor at least 10 days to cure it before termination may proceed.

The Part 49 model deviation retains the cure notice framework at 49.402-3, with DoD adopting the model text through class deviation 2026-O0010 (issued December 18, 2025, effective February 1, 2026); the proposed rule for Parts 3 and 49 (FAR Case 2026-007, published June 23, 2026) refines subpart 49.4 to distinguish more clearly when a cure notice applies from when a show cause notice is practicable. (verified September 17, 2026)

Cybersecurity Maturity Model Certification (CMMC)

The Cybersecurity Maturity Model Certification (CMMC) is the DoD program verifying that contractors protect federal contract information and CUI. Its three levels map to FAR 52.204-21, NIST SP 800-171, and NIST SP 800-172; contract requirements took effect November 10, 2025, currently held at self-assessment Phase 1.

The Cybersecurity Maturity Model Certification (CMMC) is the DoD program verifying that contractors protect federal contract information and CUI. Its three levels map to FAR 52.204-21, NIST SP 800-171, and NIST SP 800-172; contract requirements took effect November 10, 2025, currently held at self-assessment Phase 1.

CMMC lives in 32 CFR Part 170 and the DFARS rather than the FAR, so the overhaul does not rewrite it; the July 2026 Phase 2 suspension is a separate DoD program review, and the proposed FAR Part 40 CUI framework would sit alongside CMMC, not replace it.

Davis-Bacon Act (Construction Wage Rate Requirements)

The Davis-Bacon Act — codified as the Construction Wage Rate Requirements statute, 40 U.S.C. 3141 et seq. — requires contractors on federal construction contracts exceeding $2,000 to pay laborers and mechanics at least the prevailing wages and fringe benefits set in the Department of Labor wage determination.

The Davis-Bacon Act — codified as the Construction Wage Rate Requirements statute, 40 U.S.C. 3141 et seq. — requires contractors on federal construction contracts exceeding $2,000 to pay laborers and mechanics at least the prevailing wages and fringe benefits set in the Department of Labor wage determination.

The Part 22 model deviation (posted September 30, 2025) keeps subpart 22.4 — the wage requirements are statutory — while cutting non-statutory guidance such as detailed wage-schedule selection; GSA adopted it as class deviation RFO-2025-22 (issued October 7, 2025, effective November 3, 2025) and DoD as class deviation 2026-O0040 (issued February 3, 2026). Part 22 appears in neither the June 23, 2026 first-batch proposed rules nor the September 18, 2026 second batch, so published subpart 22.4 remains the citation. (verified September 28, 2026)

DD Form 254 (Contract Security Classification Specification)

The DD Form 254, Contract Security Classification Specification, tells a contractor what classified information a contract involves, at what level, and under what handling requirements. FAR 53.204-1 prescribes it for contracts requiring access to classified information under the National Industrial Security Program.

The DD Form 254, Contract Security Classification Specification, tells a contractor what classified information a contract involves, at what level, and under what handling requirements. FAR 53.204-1 prescribes it for contracts requiring access to classified information under the National Industrial Security Program.

The RFO model deviations reserve FAR subpart 4.4 and move its DD Form 254 machinery to new section 40.302, with clause 52.240-92 replacing 52.204-2; the June 2026 proposed rule (FAR Case 2026-001) would make the relocation permanent.

Defective Pricing

Defective pricing occurs when certified cost or pricing data were inaccurate, incomplete, or noncurrent as of the date of price agreement. Under FAR 15.407-1 the government is entitled to a price reduction, including profit or fee, for any significant resulting increase.

Defective pricing occurs when certified cost or pricing data were inaccurate, incomplete, or noncurrent as of the date of price agreement. Under FAR 15.407-1 the government is entitled to a price reduction, including profit or fee, for any significant resulting increase.

The Part 15 model deviation (posted September 30, 2025) moves defective pricing from 15.407-1 to a new section 15.304, Defective Certified Cost or Pricing Data After Award, in the postaward subpart, with the price-adjustment entitlement, interest, and knowing-submission penalty preserved; GSA adopted the deviated part as class deviation RFO-2025-15 effective November 3, 2025, and DoD as class deviation 2026-O0048 (issued March 5, 2026). Part 15 is not among the June 23, 2026 first-batch proposed rules, so published 15.407-1 remains the baseline absent an agency deviation. (verified September 25, 2026)

Defense Contract Audit Agency (DCAA)

The Defense Contract Audit Agency (DCAA) performs contract audits for DoD and, by agreement, other federal agencies. Under FAR 42.101 it is normally the responsible government audit agency for contractors other than educational institutions and nonprofits; its reports advise the contracting officer, who decides.

The Defense Contract Audit Agency (DCAA) performs contract audits for DoD and, by agreement, other federal agencies. Under FAR 42.101 it is normally the responsible government audit agency for contractors other than educational institutions and nonprofits; its reports advise the contracting officer, who decides.

The Part 42 model deviation keeps subpart 42.1 and the 42.101 designation of DCAA as the normal responsible audit agency, edited into plain language; DoD adopted the model text with DFARS 242 through class deviation 2026-O0050 effective March 6, 2026, and Part 42 was not among the parts in the June 23, 2026 proposed rules.

Defense Contract Management Agency (DCMA)

The Defense Contract Management Agency (DCMA) is the DoD combat support agency that performs contract administration services. When a procuring contracting officer delegates a contract under FAR 42.202, DCMA's administrative contracting officers carry out the FAR 42.302 functions at and near contractor facilities.

The Defense Contract Management Agency (DCMA) is the DoD combat support agency that performs contract administration services. When a procuring contracting officer delegates a contract under FAR 42.202, DCMA's administrative contracting officers carry out the FAR 42.302 functions at and near contractor facilities.

The Part 42 model deviation retains the 42.302 function lists DCMA works from (71 delegable functions in paragraph (a), 11 requiring specific authorization in (b)); DoD adopted the model text with a rewritten DFARS 242 through class deviation 2026-O0050 effective March 6, 2026, and Part 42 was not among the parts in the four proposed rules published June 23, 2026.

Defense Federal Acquisition Regulation Supplement (DFARS)

The Defense Federal Acquisition Regulation Supplement (DFARS) is the Department of Defense's implementation and supplementation of the FAR, codified at 48 CFR Chapter 2, issued under the authority of the Secretary of Defense, and paired with the non-regulatory PGI companion.

The Defense Federal Acquisition Regulation Supplement (DFARS) is the Department of Defense's implementation and supplementation of the FAR, codified at 48 CFR Chapter 2, issued under the authority of the Secretary of Defense, and paired with the non-regulatory PGI companion.

DoD ran the overhaul on its own book in parallel, issuing class deviations 2026-O0002 through 2026-O0050 from December 18, 2025 through March 2026 to adopt RFO text and revise DFARS parts, so check the deviation before citing codified Chapter 2 text.

Defense Priorities and Allocations System (DPAS)

The Defense Priorities and Allocations System (DPAS), at 15 CFR part 700, obligates suppliers to accept and fill rated orders for approved national defense programs ahead of other work. DX orders take preference over DO orders; both outrank unrated business.

The Defense Priorities and Allocations System (DPAS), at 15 CFR part 700, obligates suppliers to accept and fill rated orders for approved national defense programs ahead of other work. DX orders take preference over DO orders; both outrank unrated business.

The Part 11 model deviation strips Describing Agency Needs to its statutory core but keeps the priorities-and-allocations coverage. GSA adopted it as class deviation RFO-2025-11 (issued June 13, 2025, effective on issuance) and DoD through class deviation 2026-O0013 (issued December 18, 2025); Part 11 is not among the June 23, 2026 first-batch proposed rules. The system itself lives in 15 CFR part 700, outside the FAR's reach. (verified October 1, 2026)

Determination & Findings (D&F)

A Determination & Findings (D&F) is a signed document in which an authorized official makes a specific determination required by statute or regulation, supported by written findings of fact — the government's standard instrument for justifying discretionary acquisition decisions.

A Determination & Findings (D&F) is a signed document in which an authorized official makes a specific determination required by statute or regulation, supported by written findings of fact — the government's standard instrument for justifying discretionary acquisition decisions.

Part 1 is in the June 2026 first-batch proposed rules (91 FR 37550), which keep D&F policy intact but relocate it from subpart 1.7 to proposed subpart 1.5; confirm numbering once the rule is finalized.

DoD Impact Levels (IL2-IL6)

DoD impact levels sort cloud-hosted defense information by sensitivity: IL2 for non-controlled unclassified information, IL4 for CUI, IL5 for CUI needing added protection plus unclassified national security systems, and IL6 for classified data up to Secret. The level dictates which authorized cloud services may host the data.

DoD impact levels sort cloud-hosted defense information by sensitivity: IL2 for non-controlled unclassified information, IL4 for CUI, IL5 for CUI needing added protection plus unclassified national security systems, and IL6 for classified data up to Secret. The level dictates which authorized cloud services may host the data.

Impact levels live in DoD policy and the DFARS, which the FAR Overhaul does not reach; the nearest touchpoint is proposed FAR Part 40's governmentwide FedRAMP Moderate-equivalence requirement for CUI in the cloud, which parallels the IL framework without displacing it.

Earned Value Management (EVM)

Earned value management integrates a contract's cost, schedule, and technical scope into one performance measurement baseline so progress can be measured objectively. FAR 34.201 requires an EVMS, built to the EIA-748 standard, for major acquisitions for development in accordance with OMB Circular A-11.

Earned value management integrates a contract's cost, schedule, and technical scope into one performance measurement baseline so progress can be measured objectively. FAR 34.201 requires an EVMS, built to the EIA-748 standard, for major acquisitions for development in accordance with OMB Circular A-11.

The Part 34 model deviation, released in the first wave in May 2025, keeps subpart 34.2 with its OMB Circular A-11 and EIA-748 anchors while reserving the separate integrated baseline review notice provisions at 52.234-2 and 52.234-3; Part 34 is not in the June 2026 first-batch proposed rules.

Economy Act

The Economy Act (31 U.S.C. 1535) lets a federal agency order supplies or services from another agency when it serves the government's interest, requires a determination and findings under FAR 17.502-2, and deobligates funds the servicing agency fails to obligate in time.

The Economy Act (31 U.S.C. 1535) lets a federal agency order supplies or services from another agency when it serves the government's interest, requires a determination and findings under FAR 17.502-2, and deobligates funds the servicing agency fails to obligate in time.

The Part 17 model deviation retains subpart 17.5 with plain-language revisions, and the D&F requirement is rooted in the statute, so Economy Act mechanics carry through the overhaul intact.

Engineering Change Proposal (ECP)

An Engineering Change Proposal (ECP) is the formal request, prepared on DD Form 1692 under DoD configuration management practice, to change an approved configuration baseline. A government Configuration Control Board dispositions it; only a modification signed by the contracting officer gives it contractual effect.

An Engineering Change Proposal (ECP) is the formal request, prepared on DD Form 1692 under DoD configuration management practice, to change an approved configuration baseline. A government Configuration Control Board dispositions it; only a modification signed by the contracting officer gives it contractual effect.

The FAR Overhaul's Part 43 model deviation (RFO-2025-43) keeps the bilateral and unilateral modification framework an ECP rides on, and DoD's class deviation 2026-O0034 (effective January 12, 2026) carries DFARS Part 243 into the overhaul; ECP mechanics themselves live in MIL-HDBK-61B and DD Form 1692, which the overhaul does not touch.

Excusable Delay

An excusable delay is a performance failure arising from causes beyond the contractor's control and without its fault or negligence — acts of God, government acts, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, unusually severe weather — that shields the contractor from default.

An excusable delay is a performance failure arising from causes beyond the contractor's control and without its fault or negligence — acts of God, government acts, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, unusually severe weather — that shields the contractor from default.

The Part 49 model deviation (released August 21, 2025) left the termination clauses at 52.249-1 through 52.249-14 unchanged, and DoD adopted the model text through class deviation 2026-O0010 (issued December 18, 2025, effective February 1, 2026); Part 49 is in the June 23, 2026 first-batch proposed rules (FAR Case 2026-007, paired with Part 3; comments closed July 23, 2026), while the clause texts themselves sit in Part 52. (verified October 2, 2026)

Facility Security Clearance (FCL)

A facility security clearance (FCL) is the government's determination, under 32 CFR 117.9, that a company is eligible to access classified information at a specified level. A company cannot apply for its own; a government contracting activity or a cleared contractor must sponsor it.

A facility security clearance (FCL) is the government's determination, under 32 CFR 117.9, that a company is eligible to access classified information at a specified level. A company cannot apply for its own; a government contracting activity or a cleared contractor must sponsor it.

The NISPOM sits in title 32, not the FAR, so the overhaul leaves FCL requirements untouched; the FAR-side hook moves from subpart 4.4 to section 40.302 under the Part 40 model deviation and the June 2026 proposed rule (FAR Case 2026-001).

Fair and Reasonable Price

The pricing standard every federal award must meet: FAR 15.402(a) directs contracting officers to purchase supplies and services from responsible sources at fair and reasonable prices, established through price analysis, cost analysis, or cost realism analysis and documented before award.

The pricing standard every federal award must meet: FAR 15.402(a) directs contracting officers to purchase supplies and services from responsible sources at fair and reasonable prices, established through price analysis, cost analysis, or cost realism analysis and documented before award.

The Part 15 model deviation (posted September 30, 2025 alongside Parts 16, 22, 23, 25, 32, 42 and 53; informal feedback closed November 3, 2025) restructures negotiation coverage but keeps a contract-pricing subpart 15.4 and restates the fair-and-reasonable duty at 15.202(d). DoD adopted it through class deviation 2026-O0048 (March 5, 2026), covering DFARS 215. Part 15 is not among the first-batch proposed rules published June 23, 2026 (beginning at 91 FR 37550), so published FAR 15.402 and 15.404-1 remain the citations absent an agency deviation. (verified October 5, 2026)

Fair Opportunity

Fair opportunity is the requirement at FAR 16.505(b)(1) that every awardee of a multiple-award contract be considered for each order exceeding the micro-purchase threshold. Exceptions such as urgency, a single capable awardee, or a logical follow-on must be justified in writing.

Fair opportunity is the requirement at FAR 16.505(b)(1) that every awardee of a multiple-award contract be considered for each order exceeding the micro-purchase threshold. Exceptions such as urgency, a single capable awardee, or a logical follow-on must be justified in writing.

The Part 16 model deviation relocates fair opportunity from 16.505(b) to a tiered 16.507, with separate procedures at the micro-purchase, simplified acquisition, and $7.5 million breakpoints and exceptions at 16.507-6, so confirm section numbers against your agency's adopted deviation.

Federal Acquisition Regulation (FAR)

The Federal Acquisition Regulation (FAR) is the governmentwide regulation establishing uniform policies and procedures for acquisition by executive agencies, codified at 48 CFR Chapter 1 and issued jointly by the Secretary of Defense and the Administrators of GSA and NASA.

The Federal Acquisition Regulation (FAR) is the governmentwide regulation establishing uniform policies and procedures for acquisition by executive agencies, codified at 48 CFR Chapter 1 and issued jointly by the Secretary of Defense and the Administrators of GSA and NASA.

The FAR is the object of the overhaul itself: E.O. 14275 (April 2025) ordered the rewrite, agencies adopted model deviation text part by part through 2025, and formal proposed rules began publishing June 23, 2026.

Federal Risk and Authorization Management Program (FedRAMP)

The Federal Risk and Authorization Management Program (FedRAMP), codified at 44 U.S.C. 3607-3616 and housed in GSA, provides a standardized, reusable approach to security assessment and authorization for cloud products and services that process unclassified federal information.

The Federal Risk and Authorization Management Program (FedRAMP), codified at 44 U.S.C. 3607-3616 and housed in GSA, provides a standardized, reusable approach to security assessment and authorization for cloud products and services that process unclassified federal information.

FedRAMP is statutory and sits outside the FAR, but FAR Case 2026-001 (proposed June 23, 2026) writes it into proposed Part 40, requiring cloud services that hold CUI to meet security equivalent to the FedRAMP Moderate baseline and excusing FedRAMP-authorized providers with incident-reporting procedures from duplicate CUI incident reporting.

Firm-Fixed-Price (FFP)

A firm-fixed-price (FFP) contract sets a price that is not subject to adjustment based on the contractor's cost experience in performance. FAR 16.202 places maximum cost risk on the contractor, who absorbs every overrun and keeps every underrun.

A firm-fixed-price (FFP) contract sets a price that is not subject to adjustment based on the contractor's cost experience in performance. FAR 16.202 places maximum cost risk on the contractor, who absorbs every overrun and keeps every underrun.

The Part 16 model deviation keeps FFP at 16.202 and adds section 16.104, implementing Executive Order 14402's fixed-price default: other-than-fixed-price contracts now need written justification, with agency-head approval at $100 million for DoD, $35 million for NASA, $25 million for DHS, and $10 million for other agencies.

Fixed-Price Incentive Firm Target (FPIF)

A fixed-price incentive firm target (FPIF) contract sets a target cost, target profit, price ceiling, and profit adjustment formula at award under FAR 16.403-1. Final profit moves against actual cost through the share formula, and every dollar above the ceiling is the contractor's loss.

A fixed-price incentive firm target (FPIF) contract sets a target cost, target profit, price ceiling, and profit adjustment formula at award under FAR 16.403-1. Final profit moves against actual cost through the share formula, and every dollar above the ceiling is the contractor's loss.

The Part 16 model deviation moves fixed-price incentive coverage into a dedicated incentive subpart at 16.404-1, adopted at GSA as class deviation RFO-2025-16 (issued September 29, 2025, effective November 3, 2025) and at DoD through class deviation 2026-O0045 (effective February 20, 2026); new section 16.104 carries Executive Order 14402's fixed-price preference, and Part 16 is not among the June 23, 2026 first-batch proposed rules. (verified September 17, 2026)

Flow-Down Clauses

Flow-down clauses are prime contract clauses the contractor must insert in its subcontracts, carrying government requirements down the supply chain. Each clause's own text imposes the obligation; FAR 52.244-6 lists the clauses that reach subcontracts for commercial products and services.

Flow-down clauses are prime contract clauses the contractor must insert in its subcontracts, carrying government requirements down the supply chain. Each clause's own text imposes the obligation; FAR 52.244-6 lists the clauses that reach subcontracts for commercial products and services.

The Part 44 model deviation keeps the flowdown architecture: subpart 44.4 remains the commercial-subcontract home, 52.244-6 is retained with streamlining updates, and contracting officers are told not to impose clauses beyond its list on commercial subcontractors. GSA adopted the model text as class deviation RFO-2025-44 (issued August 27, 2025, effective November 3, 2025) and DoD as class deviation 2026-O0015 (issued December 18, 2025, effective February 1, 2026). Part 44 is in the September 18, 2026 second-batch proposed rules (FAR case 2026-003, 91 FR 59406, comments due October 19, 2026), which reorganize the part without substantive change, so 52.244-6 stays the operative flowdown list. (verified September 29, 2026)

Government-Furnished Property (GFP)

Government-furnished property is property in the possession of, or directly acquired by, the government and subsequently furnished to a contractor for contract performance. FAR Part 45 sets the policy; the Government Property clause at FAR 52.245-1 carries the contractor's duties.

Government-furnished property is property in the possession of, or directly acquired by, the government and subsequently furnished to a contractor for contract performance. FAR Part 45 sets the policy; the Government Property clause at FAR 52.245-1 carries the contractor's duties.

The Part 45 model deviation, released September 11, 2025, keeps the subpart structure and the 52.245-1 clause family while directing agencies to accept contractors' existing property systems and voluntary consensus standards rather than imposing separate ones; Part 45 was not in the June 2026 first-wave proposed rules.

Governmentwide Commercial Purchase Card (GPC)

The Governmentwide commercial purchase card (GPC) is the government charge card that FAR 13.201(b) makes the preferred method to buy and pay for micro-purchases — generally $15,000 or less — and that FAR 13.301 also authorizes for placing orders and paying contract invoices.

The Governmentwide commercial purchase card (GPC) is the government charge card that FAR 13.201(b) makes the preferred method to buy and pay for micro-purchases — generally $15,000 or less — and that FAR 13.301 also authorizes for placing orders and paying contract invoices.

The Part 13 model deviation (posted September 18, 2025) narrows the part to noncommercial buys at or below the simplified acquisition threshold; GSA adopted it as class deviation RFO-2025-13 (effective November 3, 2025) and DoD as class deviation 2026-O0029 (issued December 18, 2025). Part 13 is in the September 18, 2026 second-batch proposed rules (91 FR 59406, comments due October 19, 2026), which rename it Simplified Procedures for Noncommercial Acquisitions and send micro-purchase procedures to FAR subpart 12.4, so published 13.301 and 13.201 remain the baseline citations absent an agency deviation. (verified September 28, 2026)

GSA Multiple Award Schedule (MAS)

The GSA Multiple Award Schedule, still widely called the Federal Supply Schedule, is a program of long-term governmentwide contracts for commercial products and services at negotiated ceiling prices. Agencies place orders and BPAs under FAR Subpart 8.4 rather than Part 13 or 15 procedures.

The GSA Multiple Award Schedule, still widely called the Federal Supply Schedule, is a program of long-term governmentwide contracts for commercial products and services at negotiated ceiling prices. Agencies place orders and BPAs under FAR Subpart 8.4 rather than Part 13 or 15 procedures.

The Part 8 model deviation (August 14, 2025) pulls the prescriptive ordering procedures out of subpart 8.4 and points ordering activities to FSS procedures established by GSA, codified at GSAR subpart 538.71 effective November 3, 2025; Part 8 is not in the June 2026 first-batch proposed rules.

HUBZone Program

The HUBZone program, created by the HUBZone Act of 1997 and run by SBA, steers federal contracts to small businesses that keep their principal office in a historically underutilized business zone and draw at least 35 percent of employees from HUBZone residents.

The HUBZone program, created by the HUBZone Act of 1997 and run by SBA, steers federal contracts to small businesses that keep their principal office in a historically underutilized business zone and draw at least 35 percent of employees from HUBZone residents.

The Part 19 model deviation folds HUBZone presolicitation rules into its lifecycle structure while keeping the set-aside, sole-source, and price-preference mechanics intact; Part 19 is not in the June 2026 first-batch proposed rules, so published subpart 19.13 remains the operative citation absent an agency deviation.

Incremental Funding

Incremental funding obligates money to a contract in installments as funds become available rather than covering the full estimated cost at award; the Limitation of Funds clause at FAR 52.232-22 caps the government's liability at the amount allotted. FAR 32.703-1 governs.

Incremental funding obligates money to a contract in installments as funds become available rather than covering the full estimated cost at award; the Limitation of Funds clause at FAR 52.232-22 caps the government's liability at the amount allotted. FAR 32.703-1 governs.

The Part 32 model deviation (posted September 30, 2025) carries contract funding forward at subpart 32.7, keeping incremental funding at 32.703-1 and limitation of cost or funds at 32.704; DoD adopted the deviated part through class deviation 2026-O0022 (issued December 18, 2025). Part 32 is not among the June 23, 2026 first-batch proposed rules, so published subpart 32.7 remains the baseline absent an agency deviation. (verified September 23, 2026)

Indefinite Delivery/Indefinite Quantity (IDIQ)

An Indefinite Delivery/Indefinite Quantity (IDIQ) contract buys an unspecified quantity of supplies or services, within stated minimum and maximum limits, over a fixed period. The government buys through task or delivery orders under FAR 16.504, with a preference for multiple awards.

An Indefinite Delivery/Indefinite Quantity (IDIQ) contract buys an unspecified quantity of supplies or services, within stated minimum and maximum limits, over a fixed period. The government buys through task or delivery orders under FAR 16.504, with a preference for multiple awards.

The Part 16 model deviation keeps IDIQ coverage in subpart 16.5, retains the multiple-award preference and the $150 million single-award determination, and adds express on-ramp and off-ramp authority for multiple-award vehicles.

Independent Government Cost Estimate (IGCE)

An Independent Government Cost Estimate (IGCE) is the government's own documented estimate of what a requirement should cost, developed without contractor input, used to validate budgets, evaluate price reasonableness, and support negotiation positions.

An Independent Government Cost Estimate (IGCE) is the government's own documented estimate of what a requirement should cost, developed without contractor input, used to validate budgets, evaluate price reasonableness, and support negotiation positions.

The Part 15 model deviation (September 30, 2025) restructures subpart 15.4's cost and price analysis coverage while keeping the IGCE's role in validating price reasonableness; Part 15 is not in the June 2026 first-batch proposed rules, so published 15.404-1 remains the citation absent an agency deviation. (verified September 12, 2026)

Indirect Cost Rates

Indirect cost rates allocate a contractor's overhead, fringe, and G&A pools across contracts. Interim billings run on provisional billing rates under FAR 42.704; final rates are settled for each fiscal year by contracting officer or auditor determination under FAR 42.705 from a certified proposal.

Indirect cost rates allocate a contractor's overhead, fringe, and G&A pools across contracts. Interim billings run on provisional billing rates under FAR 42.704; final rates are settled for each fiscal year by contracting officer or auditor determination under FAR 42.705 from a certified proposal.

The Part 42 model deviation (posted September 30, 2025) moves indirect cost rates from subpart 42.7 to a renumbered subpart 42.5 with plain-language edits, substance preserved; GSA adopted it as class deviation RFO-2025-42 effective November 3, 2025, and DoD as class deviation 2026-O0050 (issued March 6, 2026). Part 42 is not among the June 23, 2026 first-batch proposed rules, so published subpart 42.7 remains the baseline absent an agency deviation. (verified September 24, 2026)

Inherently Governmental Functions

An inherently governmental function is work so intimately related to the public interest that government employees must perform it — exercising discretion in applying government authority or making value judgments for the government. FAR 7.503 bars contractors from performing these functions.

An inherently governmental function is work so intimately related to the public interest that government employees must perform it — exercising discretion in applying government authority or making value judgments for the government. FAR 7.503 bars contractors from performing these functions.

The Part 7 model deviation carries subpart 7.5 forward intact — the prohibition and the 7.503(c) and (d) example lists survive the rewrite. GSA adopted the model text as class deviation RFO-2025-07 (issued September 2, 2025, effective November 3, 2025) and DoD as class deviation 2026-O0020 (issued December 18, 2025, effective February 1, 2026). The June 23, 2026 first-batch proposed rule (FAR case 2026-002, 91 FR 37636, comments closed July 23, 2026) relocates the policy from subpart 7.5 to new subpart 37.3 as service-contracting planning; until that rule goes final, published subpart 7.5 remains the citation. (verified September 29, 2026)

Justification & Approval (J&A)

A Justification & Approval (J&A) is the formal document required by FAR 6.303 to justify awarding a federal contract without full and open competition, citing one of seven statutory exceptions and approved at thresholds based on dollar value.

A Justification & Approval (J&A) is the formal document required by FAR 6.303 to justify awarding a federal contract without full and open competition, citing one of seven statutory exceptions and approved at thresholds based on dollar value.

The Part 6 model deviation was among the first issued (spring 2025) and streamlines competition coverage without generally substantive change; agencies adopted it through class deviations — GSA's RFO-2025-06 in July 2025, DoD via class deviation 2026-O0017, Revision 2 (August 5, 2026), covering DFARS 206. The June 23, 2026 first-batch proposed rule (91 FR 37636, comments closed July 23, 2026) carries Part 6 into formal rulemaking, consolidating subpart 6.2 content into 6.102 without substantively changing competition policy, so published FAR 6.303 remains the citation absent an agency deviation. (verified September 28, 2026)

Letter Contract

A letter contract is a written preliminary contractual instrument under FAR 16.603 that authorizes a contractor to begin work immediately, before terms and price are settled. Definitization must follow within 180 days or completion of 40 percent of the work, whichever comes first.

A letter contract is a written preliminary contractual instrument under FAR 16.603 that authorizes a contractor to begin work immediately, before terms and price are settled. Definitization must follow within 180 days or completion of 40 percent of the work, whichever comes first.

The Part 16 model deviation (posted September 30, 2025) retains letter contracts at 16.603-1 through 16.603-4 while adding section 16.104, the Executive Order 14402 justification regime for other-than-fixed-price awards. DoD adopted the rewrite through class deviation 2026-O0045 (issued February 20, 2026; Revision 1 effective March 16, 2026); Part 16 is not among the four first-batch proposed rules published June 23, 2026, so published FAR 16.603 remains the citation absent an agency deviation. (verified September 30, 2026)

Limitation of Cost / Limitation of Funds (LOC/LOF)

Limitation of Cost (FAR 52.232-20) and Limitation of Funds (FAR 52.232-22) cap the government's liability on cost-reimbursement contracts at the estimated cost or the funds allotted, and require written contractor notice as spending approaches the ceiling.

Limitation of Cost (FAR 52.232-20) and Limitation of Funds (FAR 52.232-22) cap the government's liability on cost-reimbursement contracts at the estimated cost or the funds allotted, and require written contractor notice as spending approaches the ceiling.

The Part 32 model deviation (posted September 30, 2025, with updated text October 9, 2025) keeps both clauses, listing 52.232-20 and 52.232-22 among those updated for clarity and cross-references; DoD adopted the deviated part through class deviation 2026-O0022 (issued December 18, 2025, effective February 1, 2026). Part 32 appears in neither the June 23, 2026 first-batch proposed rules nor the September 18, 2026 second batch. (verified October 2, 2026)

Limitations on Subcontracting

Limitations on subcontracting cap what a small business prime on a set-aside contract may pay subcontractors that are not similarly situated: 50 percent of the amount the government pays for services and supplies, 85 percent for general construction, 75 percent for special trade construction.

Limitations on subcontracting cap what a small business prime on a set-aside contract may pay subcontractors that are not similarly situated: 50 percent of the amount the government pays for services and supplies, 85 percent for general construction, 75 percent for special trade construction.

The RFO Part 19 model deviation rebuilds the part around three subparts and moves the clause prescription to 19.104-3(c); the percentages are statutory and carry over unchanged.

Liquidated Damages

Liquidated damages are preset amounts a contractor owes for late delivery or performance, used under FAR subpart 11.5 when timeliness matters, actual damage would be hard to prove, and the rate reasonably forecasts the Government's probable loss rather than punishing delay.

Liquidated damages are preset amounts a contractor owes for late delivery or performance, used under FAR subpart 11.5 when timeliness matters, actual damage would be hard to prove, and the rate reasonably forecasts the Government's probable loss rather than punishing delay.

The Part 11 model deviation (posted June 18, 2025; informal feedback closed August 4, 2025) retains liquidated damages coverage, renumbered from subpart 11.5 to 11.4; DoD adopted the rewrite through class deviation 2026-O0013 (effective February 1, 2026), covering DFARS 211. Part 11 appears in neither the first batch of proposed rules published June 23, 2026 (beginning at 91 FR 37550) nor the second batch published September 18, 2026 (beginning at 91 FR 59406), so published FAR subpart 11.5 and the 52.211-11 and 52.211-12 clauses remain the citations absent an agency deviation. (verified October 6, 2026)

Lowest Price Technically Acceptable (LPTA)

Lowest Price Technically Acceptable (LPTA) is a source selection process that awards to the lowest-priced offeror whose proposal meets minimum acceptability standards — no credit is given for exceeding requirements, and tradeoffs between price and quality are not permitted.

Lowest Price Technically Acceptable (LPTA) is a source selection process that awards to the lowest-priced offeror whose proposal meets minimum acceptability standards — no credit is given for exceeding requirements, and tradeoffs between price and quality are not permitted.

The Part 15 model deviation (September 30, 2025) carries source selection procedures into its condensed five-subpart structure, and the statutory limits on DoD's use of LPTA, implemented at DFARS 215.101-2, remain in force regardless of FAR restructuring. Part 15 is not in the June 2026 first-batch proposed rules, so published 15.101-2 controls absent an agency deviation. (verified September 12, 2026)

Major Defense Acquisition Program (MDAP)

A major defense acquisition program (MDAP) is a DoD program so designated by the Secretary of Defense or estimated to exceed $1 billion in RDT&E or $4.5 billion in procurement, in fiscal year 2024 constant dollars, under 10 U.S.C. 4201.

A major defense acquisition program (MDAP) is a DoD program so designated by the Secretary of Defense or estimated to exceed $1 billion in RDT&E or $4.5 billion in procurement, in fiscal year 2024 constant dollars, under 10 U.S.C. 4201.

MDAP definition and oversight sit in title 10 and DoD policy rather than the FAR, so the overhaul's model deviations do not touch them. The operative change came by statute instead: the FY 2026 NDAA (Pub. L. 119-60, section 1804(d), December 18, 2025) reset the thresholds to $1 billion RDT&E and $4.5 billion procurement in fiscal year 2024 constant dollars. (verified September 30, 2026)

Market Research Report

A Market Research Report documents the techniques an agency used to survey the marketplace for a requirement and the conclusions drawn — including available sources, commercial solutions, small business capability, and the competition strategy those findings support.

A Market Research Report documents the techniques an agency used to survey the marketplace for a requirement and the conclusions drawn — including available sources, commercial solutions, small business capability, and the competition strategy those findings support.

The Part 10 model deviation (May 23, 2025) rewrote market research coverage, and the June 23, 2026 proposed rule at 91 FR 37636 moves it from Part 10 into subpart 7.2 under acquisition planning; DoD's Part 7 class deviation 2026-O0020, Revision 1 (September 2, 2026) carries the DFARS acquisition-planning side. The documentation requirement survives with new section numbers pending final rulemaking. (verified September 12, 2026)

Middle Tier of Acquisition (MTA)

The Middle Tier of Acquisition (MTA) is a DoD pathway under 10 U.S.C. 3602 for rapid prototyping and rapid fielding programs completable within five years, exempt from JCIDS and DoD Directive 5000.01 and governed by DoDI 5000.80.

The Middle Tier of Acquisition (MTA) is a DoD pathway under 10 U.S.C. 3602 for rapid prototyping and rapid fielding programs completable within five years, exempt from JCIDS and DoD Directive 5000.01 and governed by DoDI 5000.80.

MTA sits in Title 10 and DoD policy rather than the FAR, so the FAR Overhaul's model deviations do not touch it; the FY 2025 NDAA separately codified the authority at 10 U.S.C. 3602.

Military Interdepartmental Purchase Request (MIPR)

A Military Interdepartmental Purchase Request (MIPR) is the DD Form 448 order a DoD component uses to send a requirement and funds to another military department or agency, accepted on DD Form 448-2 on a reimbursable (Category I) or direct-citation (Category II) basis.

A Military Interdepartmental Purchase Request (MIPR) is the DD Form 448 order a DoD component uses to send a requirement and funds to another military department or agency, accepted on DD Form 448-2 on a reimbursable (Category I) or direct-citation (Category II) basis.

No direct impact: MIPR procedures live in the DFARS, its PGI, and the DoD FMR rather than FAR text, so the Revolutionary FAR Overhaul model deviations leave them untouched.

Modular Open Systems Approach (MOSA)

A modular open systems approach (MOSA) is the integrated business and technical strategy 10 U.S.C. 4401 requires of major defense acquisition programs: modular designs with interfaces built to widely supported, consensus-based standards so components can be added, removed, or replaced across the life cycle.

A modular open systems approach (MOSA) is the integrated business and technical strategy 10 U.S.C. 4401 requires of major defense acquisition programs: modular designs with interfaces built to widely supported, consensus-based standards so components can be added, removed, or replaced across the life cycle.

MOSA sits in title 10 and DoD engineering policy, which the FAR Overhaul's model deviations do not rewrite; the recent statutory movement came from the FY 2025 NDAA, which added interface-standard disclosure requirements to 10 U.S.C. 4401.

Multiyear Contracting (MYP)

A multiyear contract buys more than one but not more than five program years of requirements under a single contract without annual options, per FAR subpart 17.1. Later years ride on annual funding; a negotiated cancellation ceiling caps the government's exposure if the money stops.

A multiyear contract buys more than one but not more than five program years of requirements under a single contract without annual options, per FAR subpart 17.1. Later years ride on annual funding; a negotiated cancellation ceiling caps the government's exposure if the money stops.

The Part 17 model deviation keeps subpart 17.1 and restructures it: definitions move to 17.102 and policy to 17.103-1, which carries the 10 U.S.C. 3501 statutory tests including the $500 million certification. GSA adopted it as class deviation RFO-2025-17 (issued September 8, 2025, effective November 3, 2025) and DoD through class deviation 2026-O0027 (issued December 18, 2025); Part 17 is not among the June 23, 2026 first-batch proposed rules. (verified October 1, 2026)

NIST SP 800-171

NIST Special Publication 800-171 lists the security requirements for protecting CUI on nonfederal information systems. DFARS 252.204-7012 makes it contractual for defense work — held at Revision 2 by class deviation — and its 110 requirements are the CMMC Level 2 baseline.

NIST Special Publication 800-171 lists the security requirements for protecting CUI on nonfederal information systems. DFARS 252.204-7012 makes it contractual for defense work — held at Revision 2 by class deviation — and its 110 requirements are the CMMC Level 2 baseline.

The June 2026 proposed FAR CUI framework (FAR Case 2026-001) would carry 800-171 governmentwide, its standard form specifying organization-defined parameters for Revision 3, while DoD's class deviation keeps DFARS work on Revision 2.

Nonmanufacturer Rule (NMR)

The nonmanufacturer rule lets a small business that did not make a product win a supply set-aside if it has 500 or fewer employees, normally sells such items, takes ownership or possession of them, and supplies the end item of a domestic small manufacturer. FAR 19.505(c) and 13 CFR 121.406 govern.

The nonmanufacturer rule lets a small business that did not make a product win a supply set-aside if it has 500 or fewer employees, normally sells such items, takes ownership or possession of them, and supplies the end item of a domestic small manufacturer. FAR 19.505(c) and 13 CFR 121.406 govern.

The Part 19 model deviation (posted September 26, 2025) rebuilds the part into three lifecycle subparts and carries the nonmanufacturer rule at 19.104-1(f), substance preserved; GSA adopted it as class deviation RFO-2025-19 effective November 3, 2025, and DoD as class deviation 2026-O0037 effective February 1, 2026. Part 19 is not among the June 23, 2026 first-batch proposed rules, and SBA's parallel rule at 13 CFR 121.406 sits outside the FAR, untouched by the overhaul. (verified September 23, 2026)

North American Industry Classification System (NAICS) Code

A NAICS code is the industry classification a contracting officer assigns to each federal solicitation, chosen for the one industry that best describes the principal purpose of the acquisition. The code fixes the small business size standard that decides who may compete as small.

A NAICS code is the industry classification a contracting officer assigns to each federal solicitation, chosen for the one industry that best describes the principal purpose of the acquisition. The code fixes the small business size standard that decides who may compete as small.

The Part 19 model deviation carries NAICS designation at 19.103(b) and appeals at 19.103(d), keeping the one-code rule and the October 1, 2028 multiple-award change; Part 19 is not in the June 2026 proposed rules, so published 19.102 and 19.103 control absent an agency deviation.

Organizational Conflict of Interest (OCI)

An organizational conflict of interest (OCI) exists when a contractor's other activities or relationships leave it unable to give impartial assistance or advice, or hand it an unfair competitive advantage. FAR subpart 9.5 requires contracting officers to identify conflicts early and avoid, neutralize, or mitigate them before award.

An organizational conflict of interest (OCI) exists when a contractor's other activities or relationships leave it unable to give impartial assistance or advice, or hand it an unfair competitive advantage. FAR subpart 9.5 requires contracting officers to identify conflicts early and avoid, neutralize, or mitigate them before award.

The Part 9 model deviation retains subpart 9.5 with plain-language edits, while a separate proposed rule under FAR case 2023-006, implementing Pub. L. 117-324, would move OCI coverage to a new subpart 3.12 with standard provisions and clauses; that rule remained unfinalized as of this entry's verification, so watch both tracks.

Other Transaction Authority (OTA)

Other Transaction Authority (OTA) lets certain agencies enter agreements for research, prototypes, and follow-on production that are not standard procurement contracts — largely exempt from the FAR — to attract nontraditional contractors and move faster than conventional acquisition allows.

Other Transaction Authority (OTA) lets certain agencies enter agreements for research, prototypes, and follow-on production that are not standard procurement contracts — largely exempt from the FAR — to attract nontraditional contractors and move faster than conventional acquisition allows.

OTs sit outside the FAR and are unaffected by the overhaul's text changes, though the reform climate has increased interest in both.

Past Performance & CPARS

Past performance is a contractor's record on earlier contracts, weighed in source selection under FAR 15.305(a)(2). Agencies document it in the Contractor Performance Assessment Reporting System (CPARS) for contracts over the simplified acquisition threshold, per FAR 42.1502.

Past performance is a contractor's record on earlier contracts, weighed in source selection under FAR 15.305(a)(2). Agencies document it in the Contractor Performance Assessment Reporting System (CPARS) for contracts over the simplified acquisition threshold, per FAR 42.1502.

The Part 42 model deviation moves contractor performance information from subpart 42.15 to subpart 42.11 and drops the source-selection-only framing in favor of use for future purposes; Part 42 is not in the June 2026 first-batch proposed rules, so FAR 42.1503 remains the published baseline absent an agency deviation.

Performance Work Statement (PWS)

A Performance Work Statement (PWS) describes required outcomes and measurable performance standards for a services acquisition rather than prescribing how the work must be done, enabling contractors to propose their own methods under performance-based acquisition.

A Performance Work Statement (PWS) describes required outcomes and measurable performance standards for a services acquisition rather than prescribing how the work must be done, enabling contractors to propose their own methods under performance-based acquisition.

The Part 37 model deviation moves performance-based acquisition policy into subpart 37.1 — the PWS requirement sits at 37.102-1 — while renumbered subpart 37.6 covers nonpersonal health care services; the published FAR still carries 37.602.

Performance-Based Payments (PBP)

Performance-based payments are the government's preferred contract financing method under FAR 32.1001: fixed-price financing paid on completion of defined, verifiable performance events rather than incurred costs, capped at 90 percent of contract or delivery-item price and liquidated from delivery payments.

Performance-based payments are the government's preferred contract financing method under FAR 32.1001: fixed-price financing paid on completion of defined, verifiable performance events rather than incurred costs, capped at 90 percent of contract or delivery-item price and liquidated from delivery payments.

The Part 32 model deviation simplifies the part while the GSA adoption memo lists no change to the performance-based payments subpart, and its clause updates (52.232-3, -12, -16, -20, -22, -36) do not include 52.232-32; GSA adopted the part as class deviation RFO-2025-32 (effective November 3, 2025), DoD through class deviation 2026-O0022 (issued December 18, 2025, effective February 1, 2026), and Part 32 appears in neither the June 23, 2026 first-batch proposed rules nor the September 18, 2026 second batch. (verified September 18, 2026)

Period of Performance (PoP)

The period of performance is the span in which the contractor is bound to perform — base period plus exercised options. For services funded with annual appropriations, its length is bounded by the fiscal-year rules at FAR 32.703-3 and FAR 37.106.

The period of performance is the span in which the contractor is bound to perform — base period plus exercised options. For services funded with annual appropriations, its length is bounded by the fiscal-year rules at FAR 32.703-3 and FAR 37.106.

The one-year severable-services authority is statutory and carries through the overhaul; the Part 37 model deviation restates it, but section numbers shift in the rewritten parts, so verify cites against your agency's adopted deviation text.

Personal Services Contract

A personal services contract creates an employer-employee relationship between the government and contractor personnel, typically through relatively continuous government supervision. FAR 37.104 bars agencies from awarding one unless a statute, such as 5 U.S.C. 3109, specifically authorizes it.

A personal services contract creates an employer-employee relationship between the government and contractor personnel, typically through relatively continuous government supervision. FAR 37.104 bars agencies from awarding one unless a statute, such as 5 U.S.C. 3109, specifically authorizes it.

The Part 37 model deviation moves personal services out of 37.104 into a dedicated subpart 37.2, condensing the six-element test into 37.201-2 while keeping the rule that agencies must not contract for personal services without statutory authority. GSA adopted the model text as class deviation RFO-2025-37 (issued September 23, 2025, effective November 3, 2025) and DoD as class deviation 2026-O0023 (issued December 18, 2025, effective February 1, 2026), whose companion DFARS Part 237 text carries the 10 U.S.C. 129b and 1091 authorities at subpart 237.2. Part 37 is in the June 23, 2026 first-batch proposed rules (FAR case 2026-002, 91 FR 37636, comments closed July 23, 2026), which keep the personal-services framework, so published 37.104 remains the citation pending final rulemaking. (verified September 29, 2026)

Planning, Programming, Budgeting, and Execution (PPBE)

PPBE is DoD's internal resource-allocation process under DoD Directive 7045.14. Planning issues the Defense Planning Guidance, programming builds each component's five-year Program Objective Memorandum, budgeting converts year one into the budget request, and execution reviews how the money performs.

PPBE is DoD's internal resource-allocation process under DoD Directive 7045.14. Planning issues the Defense Planning Guidance, programming builds each component's five-year Program Objective Memorandum, budgeting converts year one into the budget request, and execution reviews how the money performs.

No direct impact: PPBE is internal DoD resource allocation outside the FAR, so the model deviations and 2026 proposed rules rewrite acquisition regulation around it, not the process itself.

Postaward Debriefing (FAR 15.506)

A postaward debriefing is the explanation an agency owes an unsuccessful offeror that requests one in writing within 3 days of award notice. FAR 15.506 requires the evaluation of the offeror's proposal, the overall ranking, and the rationale for award.

A postaward debriefing is the explanation an agency owes an unsuccessful offeror that requests one in writing within 3 days of award notice. FAR 15.506 requires the evaluation of the offeror's proposal, the overall ranking, and the rationale for award.

The Part 15 model deviation moves debriefings into the postaward subpart as 15.301-1 and adds a follow-up-questions section at 15.301-2; Part 15 is not in the June 2026 first-batch proposed rules, so FAR 15.506 remains the published baseline absent an agency deviation.

Procurement Administrative Lead Time (PALT)

Procurement Administrative Lead Time (PALT) measures the time from a defined start point — commonly a validated requirement or issued solicitation — to contract award. It is the standard metric for acquisition process speed and a primary target of federal procurement reform.

Procurement Administrative Lead Time (PALT) measures the time from a defined start point — commonly a validated requirement or issued solicitation — to contract award. It is the standard metric for acquisition process speed and a primary target of federal procurement reform.

PALT reduction is an explicit goal of the Revolutionary FAR Overhaul; expect measurement and reporting emphasis to continue.

Procurement Integrity Act (PIA)

The Procurement Integrity Act, 41 U.S.C. 2101-2107, bars disclosing or obtaining contractor bid or proposal information or source selection information before award, regulates employment contacts between offerors and procurement officials, and bans certain former officials from accepting contractor compensation for one year. FAR 3.104 implements it.

The Procurement Integrity Act, 41 U.S.C. 2101-2107, bars disclosing or obtaining contractor bid or proposal information or source selection information before award, regulates employment contacts between offerors and procurement officials, and bans certain former officials from accepting contractor compensation for one year. FAR 3.104 implements it.

The Part 3 model deviation (posted September 11, 2025) keeps procurement integrity at 3.104 with its subsections intact; GSA adopted the deviated part as class deviation RFO-2025-03 effective November 3, 2025, and DoD as class deviation 2026-O0031 (issued December 18, 2025). Part 3 is in the June 23, 2026 first-batch proposed rules (FAR case 2026-007, paired with Part 49): the proposed part retains 3.104 and adds notice plus a written-justification window before a contracting officer disregards an offeror's markings; comments closed July 23, 2026. (verified September 24, 2026)

Product Service Code (PSC)

A Product Service Code (PSC) is the code from GSA's PSC Manual that identifies what a federal contract buys: products, services, or research and development. FAR 5.207 requires one on each synopsis, and the code follows the action into FPDS reporting.

A Product Service Code (PSC) is the code from GSA's PSC Manual that identifies what a federal contract buys: products, services, or research and development. FAR 5.207 requires one on each synopsis, and the code follows the action into FPDS reporting.

The PSC taxonomy lives in GSA's manual and FPDS rather than FAR text, so overhaul deviations leave the codes untouched; the synopsis requirement that carries the PSC sits in Part 5, which is in the June 23, 2026 proposed rule covering Parts 5, 24, and 29.

Progress Payments

Progress payments are contract financing paid as work progresses on fixed-price contracts, computed under FAR subpart 32.5 as a percentage of incurred costs — customarily 80 percent, 85 percent for small businesses, and 90 percent for small businesses at DoD — and liquidated from later delivery payments.

Progress payments are contract financing paid as work progresses on fixed-price contracts, computed under FAR subpart 32.5 as a percentage of incurred costs — customarily 80 percent, 85 percent for small businesses, and 90 percent for small businesses at DoD — and liquidated from later delivery payments.

The Part 32 model deviation (model text released September 30, 2025) simplifies the part and keeps progress payments based on costs, with 52.232-16 among the clauses updated; GSA adopted it as class deviation RFO-2025-32 (issued October 7, 2025, effective November 3, 2025) and DoD through class deviation 2026-O0022 (issued December 18, 2025, effective February 1, 2026), and Part 32 appears in neither the June 23, 2026 first-batch proposed rules nor the September 18, 2026 second batch. (verified September 18, 2026)

Prompt Payment Act

The Prompt Payment Act, 31 U.S.C. chapter 39, requires agencies to pay proper invoices by a due date, generally 30 days from receipt, and to pay interest automatically at the Treasury-published rate when they miss it. OMB implements it at 5 CFR Part 1315; FAR subpart 32.9 carries it into contracts.

The Prompt Payment Act, 31 U.S.C. chapter 39, requires agencies to pay proper invoices by a due date, generally 30 days from receipt, and to pay interest automatically at the Treasury-published rate when they miss it. OMB implements it at 5 CFR Part 1315; FAR subpart 32.9 carries it into contracts.

The Part 32 model deviation, adopted at GSA as class deviation RFO-2025-32 (issued October 7, 2025, effective November 3, 2025), retains subpart 32.9 and its prompt payment framework while revising other financing clauses; Part 32 is not among the June 23, 2026 first-batch proposed rules, and the statute and 5 CFR Part 1315 sit outside the FAR entirely. (verified September 15, 2026)

Quality Assurance Surveillance Plan (QASP)

A quality assurance surveillance plan (QASP) is the government's written plan for monitoring contractor performance. FAR 46.401(a) directs that it be prepared in conjunction with the statement of work and specify all work requiring surveillance and the method of surveillance.

A quality assurance surveillance plan (QASP) is the government's written plan for monitoring contractor performance. FAR 46.401(a) directs that it be prepared in conjunction with the statement of work and specify all work requiring surveillance and the method of surveillance.

The overhaul consolidates QASP policy in Part 46: the Part 37 model deviation removes former 37.604 as redundant while the Part 46 model text keeps the 46.401 language unchanged; DoD adopted both through class deviations 2026-O0023 (December 18, 2025) and 2026-O0035 (January 20, 2026), and Part 37, but not Part 46, is in a June 23, 2026 proposed rule.

RDT&E vs. O&M vs. Procurement Appropriations

The three workhorse DoD appropriations divide by what the money buys: O&M funds the expenses of running the force, procurement funds investment in end items, and RDT&E funds development and test. DoD FMR Volume 2A draws the lines; 31 U.S.C. 1301(a) enforces them.

The three workhorse DoD appropriations divide by what the money buys: O&M funds the expenses of running the force, procurement funds investment in end items, and RDT&E funds development and test. DoD FMR Volume 2A draws the lines; 31 U.S.C. 1301(a) enforces them.

No impact: appropriation classification lives in the DoD FMR and title 31, outside the FAR, so neither the model deviations nor the June 2026 proposed rules reach it.

Request for Equitable Adjustment (REA)

A Request for Equitable Adjustment (REA) is a contractor's proposal to adjust contract price or schedule for a government-caused change, submitted under the Changes clause rather than as a Contract Disputes Act claim. In DoD, an REA over the simplified acquisition threshold must carry the DFARS 252.243-7002 certification before payment.

A Request for Equitable Adjustment (REA) is a contractor's proposal to adjust contract price or schedule for a government-caused change, submitted under the Changes clause rather than as a Contract Disputes Act claim. In DoD, an REA over the simplified acquisition threshold must carry the DFARS 252.243-7002 certification before payment.

The Part 43 model deviation (RFO-2025-43) retains change order and equitable adjustment procedures in plain-language form, DoD's class deviation 2026-O0034 (effective January 12, 2026) carries DFARS Part 243 into the overhaul, and the REA certification itself is statutory under 10 U.S.C. 3862, so it survives whatever section numbering the final rule lands on.

Request for Information (RFI)

A Request for Information (RFI) is a formal market research instrument used to gather industry input on capabilities, approaches, pricing structures, or draft requirements when the government is not yet ready to solicit — responses are voluntary and non-binding.

A Request for Information (RFI) is a formal market research instrument used to gather industry input on capabilities, approaches, pricing structures, or draft requirements when the government is not yet ready to solicit — responses are voluntary and non-binding.

The Part 15 model deviation (September 30, 2025) moves solicitation and exchanges-with-industry coverage into subpart 15.1, and the June 23, 2026 proposed rule at 91 FR 37636 relocates market research — the context most RFIs serve — from Part 10 into subpart 7.2. Part 15 is not in the first-batch proposed rules, so published 15.201 controls absent an agency deviation. (verified September 12, 2026)

Request for Proposal (RFP)

A Request for Proposal (RFP) is the solicitation used in negotiated acquisitions under FAR Part 15. At minimum, a competitive RFP describes the government's requirement, the anticipated terms and conditions, the information the proposal must contain, and the evaluation factors and their relative importance.

A Request for Proposal (RFP) is the solicitation used in negotiated acquisitions under FAR Part 15. At minimum, a competitive RFP describes the government's requirement, the anticipated terms and conditions, the information the proposal must contain, and the evaluation factors and their relative importance.

The Part 15 model deviation (RFO-2025-15, adopted by agencies beginning November 3, 2025) collapses Part 15 into five subparts and moves solicitation guidance into subpart 15.1, adding a highest-technically-rated-with-a-fair-and-reasonable-price evaluation approach, so confirm section numbers against your agency's adopted deviation.

Request for Quotation (RFQ)

A request for quotation (RFQ) asks vendors for pricing and availability rather than binding offers. Under FAR 13.004 a quotation is not an offer; the government's order in response is the offer, and no contract exists until the supplier accepts it.

A request for quotation (RFQ) asks vendors for pricing and availability rather than binding offers. Under FAR 13.004 a quotation is not an offer; the government's order in response is the offer, and no contract exists until the supplier accepts it.

The Part 13 model deviation (September 18, 2025) rebuilds simplified procedures around presolicitation, solicitation, postaward, and micro-purchase subparts and points RFQ issuance at the deviated Part 12 commercial procedures; Part 13 is not in the June 2026 first-batch proposed rules, so FAR 13.004 controls absent an agency deviation.

Responsibility Determination

A responsibility determination is the contracting officer's affirmative finding, required by FAR 9.103 before any award, that a prospective contractor meets the FAR 9.104-1 standards: financial resources, delivery capability, performance record, integrity, organization and skills, facilities, and legal eligibility.

A responsibility determination is the contracting officer's affirmative finding, required by FAR 9.103 before any award, that a prospective contractor meets the FAR 9.104-1 standards: financial resources, delivery capability, performance record, integrity, organization and skills, facilities, and legal eligibility.

The Part 9 model deviation (released August 21, 2025; updated April 20, 2026) keeps responsibility in subpart 9.1 with the 9.104-1 general standards substantively intact; GSA adopted it as class deviation RFO-2025-09 effective November 3, 2025, and DoD as class deviation 2026-O0042 (issued February 3, 2026). Part 9 is not among the June 23, 2026 first-batch proposed rules, so published subpart 9.1 remains the baseline absent an agency deviation. (verified September 23, 2026)

Rule of Two

The rule of two directs a contracting officer to set aside an acquisition for small business when there is a reasonable expectation of receiving offers from at least two responsible small business concerns and making award at fair market prices, per FAR 19.502-2.

The rule of two directs a contracting officer to set aside an acquisition for small business when there is a reasonable expectation of receiving offers from at least two responsible small business concerns and making award at fair market prices, per FAR 19.502-2.

The Part 19 model deviation rewrites the rule at 19.104-1 with a single test above the micro-purchase threshold, adding quality and delivery to the price factors, and moves order-level set-asides to 19.111-2; Part 19 is not in the June 2026 first-batch proposed rules, so FAR 19.502-2 still controls absent an agency deviation.

SBA Mentor-Protégé Program (MPP)

The SBA Mentor-Protégé Program, at 13 CFR 125.9, pairs a small business with a mentor of any size that provides management, technical, and financial assistance. An approved pair may joint venture as a small business on work the protégé qualifies for, without affiliation arising from the agreement alone.

The SBA Mentor-Protégé Program, at 13 CFR 125.9, pairs a small business with a mentor of any size that provides management, technical, and financial assistance. An approved pair may joint venture as a small business on work the protégé qualifies for, without affiliation arising from the agreement alone.

No direct impact: the program lives in SBA's rules at 13 CFR 125.9 under 15 U.S.C. 657r, outside the FAR. The Part 19 model deviation, adopted at GSA as class deviation RFO-2025-19 (issued September 26, 2025, effective November 3, 2025), restructures small business coverage without reaching SBA's mentor-protégé or joint venture rules; Part 19 is not among the June 23, 2026 first-batch proposed rules. (verified September 15, 2026)

SBIR/STTR (Small Business Innovation Research)

SBIR and STTR are congressionally mandated programs requiring federal agencies with large R&D budgets to fund small business innovation through phased awards — feasibility (Phase I), development (Phase II), and commercialization (Phase III), which carries sole-source follow-on authority.

SBIR and STTR are congressionally mandated programs requiring federal agencies with large R&D budgets to fund small business innovation through phased awards — feasibility (Phase I), development (Phase II), and commercialization (Phase III), which carries sole-source follow-on authority.

Program authority is statutory and outside FAR overhaul scope; implementing contract mechanics still ride on FAR/DFARS text being revised.

Sealed Bidding (IFB)

Sealed bidding is the FAR Part 14 source selection method built on an invitation for bids (IFB), public bid opening, and no discussions. Award goes to the responsible bidder whose conforming bid is most advantageous to the government, considering only price and price-related factors.

Sealed bidding is the FAR Part 14 source selection method built on an invitation for bids (IFB), public bid opening, and no discussions. Award goes to the responsible bidder whose conforming bid is most advantageous to the government, considering only price and price-related factors.

The Part 14 model deviation, adopted at GSA as class deviation RFO-2025-14 (issued September 22, 2025, effective November 3, 2025), reorganizes the part around the acquisition lifecycle — four subparts, with two-step sealed bidding folded into presolicitation — while keeping the statutory sealed-bidding requirements of 10 U.S.C. and 41 U.S.C.; Part 14 is not among the June 23, 2026 first-batch proposed rules. (verified September 16, 2026)

Section 889 (Covered Telecom Prohibition)

Section 889 of the FY2019 NDAA bars agencies from buying covered telecommunications equipment or services (Huawei and ZTE telecom gear; Hytera, Hikvision, and Dahua video surveillance) and from contracting with entities that use them. FAR subpart 4.21 implements both prohibitions.

Section 889 of the FY2019 NDAA bars agencies from buying covered telecommunications equipment or services (Huawei and ZTE telecom gear; Hytera, Hikvision, and Dahua video surveillance) and from contracting with entities that use them. FAR subpart 4.21 implements both prohibitions.

The June 23, 2026 proposed rule folds subpart 4.21 into the consolidated supply-chain Part 40, regrouping the provisions and clauses under proposed 52.240-2 and 52.240-3, so the prohibition keeps its Part A and Part B shape but will change clause numbers when the rule finalizes.

Service Contract Act (SCA)

The McNamara-O'Hara Service Contract Act of 1965, codified as Service Contract Labor Standards at 41 U.S.C. chapter 67, requires federal service contracts over $2,500 to pay service employees at least the prevailing wages and fringe benefits set by Department of Labor wage determinations.

The McNamara-O'Hara Service Contract Act of 1965, codified as Service Contract Labor Standards at 41 U.S.C. chapter 67, requires federal service contracts over $2,500 to pay service employees at least the prevailing wages and fringe benefits set by Department of Labor wage determinations.

The RFO Part 22 model deviation (first posted October 9, 2025) keeps subpart 22.10 — the requirements are statutory — while cutting non-statutory material elsewhere in the part.

Service-Disabled Veteran-Owned Small Business (SDVOSB)

A service-disabled veteran-owned small business (SDVOSB) is a small business at least 51 percent owned and controlled by one or more service-disabled veterans and certified by SBA under 13 CFR Part 128, making it eligible for set-asides and sole-source awards government-wide.

A service-disabled veteran-owned small business (SDVOSB) is a small business at least 51 percent owned and controlled by one or more service-disabled veterans and certified by SBA under 13 CFR Part 128, making it eligible for set-asides and sole-source awards government-wide.

The Part 19 model deviation folds subpart 19.14's set-aside and sole-source mechanics into its lifecycle structure; Part 19 is not in the June 2026 first-batch proposed rules, so published subpart 19.14 remains the operative citation absent an agency deviation.

Small Business Set-Aside

A small business set-aside restricts competition for an acquisition, or a distinct portion of one, to small business concerns. Between the micro-purchase and simplified acquisition thresholds the set-aside is automatic; above the SAT it is required whenever the rule of two is met.

A small business set-aside restricts competition for an acquisition, or a distinct portion of one, to small business concerns. Between the micro-purchase and simplified acquisition thresholds the set-aside is automatic; above the SAT it is required whenever the rule of two is met.

The Part 19 model deviation consolidates set-asides at 19.104 — one total set-aside test at 19.104-1 that adds quality and delivery to the price factors, partial set-asides at 19.104-2, order-level set-asides at 19.111-2; Part 19 is not in the June 2026 first-batch proposed rules, so FAR Subpart 19.5 controls absent an agency deviation.

Small Business Size Standards

Small business size standards are the SBA's industry-by-industry thresholds, expressed as average annual receipts or average employee counts and keyed to NAICS codes at 13 CFR 121.201, that determine whether a concern qualifies as small for federal contracting.

Small business size standards are the SBA's industry-by-industry thresholds, expressed as average annual receipts or average employee counts and keyed to NAICS codes at 13 CFR 121.201, that determine whether a concern qualifies as small for federal contracting.

The Part 19 model deviation (posted September 26, 2025; informal feedback closed November 3, 2025) reorganizes small business coverage into presolicitation, evaluation-and-award, and postaward subparts, moving size-standard policy to 19.103 while still pointing to 13 CFR 121.201. DoD adopted it through class deviation 2026-O0037 (January 21, 2026), covering DFARS 219. Part 19 is not among the first-batch proposed rules published June 23, 2026, so published FAR 19.102 remains the citation absent an agency deviation; the SBA rules at 13 CFR part 121 sit outside the FAR overhaul entirely. (verified October 5, 2026)

Small Business Subcontracting Plan

A small business subcontracting plan sets the subcontracting goals, administration, and reporting an other-than-small offeror must negotiate before award of a contract expected to exceed $900,000 ($2 million for construction), under FAR 19.702 and Section 8(d) of the Small Business Act.

A small business subcontracting plan sets the subcontracting goals, administration, and reporting an other-than-small offeror must negotiate before award of a contract expected to exceed $900,000 ($2 million for construction), under FAR 19.702 and Section 8(d) of the Small Business Act.

The Part 19 model deviation eliminates subpart 19.7 and splits subcontracting plans between presolicitation section 19.109 and postaward section 19.302, with plan elements at 19.206-2 and the $900,000/$2 million thresholds carried over; GSA adopted the model text as class deviation RFO-2025-19 (issued September 26, 2025, effective November 3, 2025), DoD through class deviation 2026-O0037 (effective January 21, 2026), and Part 19 is not among the June 23, 2026 first-batch proposed rules. (verified September 17, 2026)

Software Acquisition Pathway (SWP)

The Software Acquisition Pathway (SWP) is DoD's pathway under 10 U.S.C. 3603 and DoDI 5000.87 for iterative software delivery: a minimum viable capability release within one year of first obligation, updates at least annually, and no JCIDS or MDAP treatment.

The Software Acquisition Pathway (SWP) is DoD's pathway under 10 U.S.C. 3603 and DoDI 5000.87 for iterative software delivery: a minimum viable capability release within one year of first obligation, updates at least annually, and no JCIDS or MDAP treatment.

SWP lives in Title 10 and DoD policy, which the FAR Overhaul's deviations do not rewrite; current change comes instead from the FY 2025 NDAA codification at 10 U.S.C. 3603 and the March 2025 software acquisition memo.

Sole Source Award

A sole source award is a federal contract awarded without full and open competition under one of the seven statutory exceptions in FAR 6.302 — most often only one responsible source — and must rest on a written, certified, and approved justification.

A sole source award is a federal contract awarded without full and open competition under one of the seven statutory exceptions in FAR 6.302 — most often only one responsible source — and must rest on a written, certified, and approved justification.

The Part 6 model deviation (posted June 27, 2025; informal feedback closed August 11, 2025) rewrote competition coverage in plain language, and DoD adopted it through class deviation 2026-O0017 (effective February 1, 2026; now at Revision 1), covering DFARS 206. Part 6 is in the first batch of proposed rules published June 23, 2026 (FAR Case 2026-002; the four-document batch begins at 91 FR 37550; comments closed July 23, 2026), which restructures Part 6 into presolicitation and postaward subparts, trims the nonstatutory application text under the 6.302 authorities, and aligns justification approval thresholds with section 1804 of the FY 2026 NDAA. Published FAR 6.302-1, 6.303, and 6.304 remain the codified citations absent an agency deviation. (verified October 6, 2026)

Source Selection Plan (SSP)

A Source Selection Plan (SSP) documents how a competitive negotiated acquisition will be evaluated and decided: the organization of the evaluation team, the factors and subfactors, their relative importance, and the methodology for reaching an award decision.

A Source Selection Plan (SSP) documents how a competitive negotiated acquisition will be evaluated and decided: the organization of the evaluation team, the factors and subfactors, their relative importance, and the methodology for reaching an award decision.

The Part 15 model deviation (September 30, 2025, adopted by agencies beginning November 3, 2025) collapses Part 15 into five subparts and carries source selection planning with it, and DoD Source Selection Procedures continue to apply on top of whichever text an agency has adopted; Part 15 is not in the June 2026 first-batch proposed rules, so verify section numbers against your agency's adopted deviation. (verified September 12, 2026)

Sources Sought Notice

A Sources Sought Notice is a pre-solicitation announcement, typically posted to SAM.gov, asking companies to identify their interest and capability to perform a prospective requirement — primarily used as market research to shape competition and set-aside decisions.

A Sources Sought Notice is a pre-solicitation announcement, typically posted to SAM.gov, asking companies to identify their interest and capability to perform a prospective requirement — primarily used as market research to shape competition and set-aside decisions.

Parts 5 and 10 both carry FAR Overhaul model deviations, and the June 2026 proposed rule (91 FR 37636) moves market research from Part 10 into subpart 7.2 as part of acquisition planning; verify section numbers before citing.

Statement of Objectives (SOO)

A Statement of Objectives (SOO) is a brief government document stating top-level acquisition objectives and desired outcomes, leaving offerors free to propose their own technical approach and performance work statement in response.

A Statement of Objectives (SOO) is a brief government document stating top-level acquisition objectives and desired outcomes, leaving offerors free to propose their own technical approach and performance work statement in response.

The Part 37 model deviation relocates SOO coverage to 37.102-1(a)(1), keeping the rule that the SOO does not become part of the contract; 37.602(c) remains the citation in the published FAR.

Statement of Work (SOW)

A Statement of Work (SOW) is the contract document that prescribes, in specific and directive terms, the tasks a contractor must perform, the deliverables due, and the schedule — placing responsibility for the approach on the government.

A Statement of Work (SOW) is the contract document that prescribes, in specific and directive terms, the tasks a contractor must perform, the deliverables due, and the schedule — placing responsibility for the approach on the government.

Under the Part 37 model deviation, service work-description policy moves to subpart 37.1 (37.101-1 and 37.102-1); the published FAR still carries Part 11 and 37.602, so both citations remain valid until rulemaking lands.

Stop-Work Order

A stop-work order is the contracting officer's written direction under FAR 52.242-15 halting all or part of contract work for up to 90 days while the government decides how to proceed. Before the period ends, the government must cancel the order or terminate the work it covers.

A stop-work order is the contracting officer's written direction under FAR 52.242-15 halting all or part of contract work for up to 90 days while the government decides how to proceed. Before the period ends, the government must cancel the order or terminate the work it covers.

The Part 42 model deviation, adopted at GSA as class deviation RFO-2025-42 (issued September 30, 2025, effective November 3, 2025), compresses the part from 17 subparts to 13 and moves stop-work orders from subpart 42.13 to subpart 42.10 (Suspension of Work, Stop-Work Orders, and Government Delay of Work) without disturbing the 52.242-15 framework; Part 42 is not among the June 23, 2026 first-batch proposed rules. (verified September 16, 2026)

Suspension and Debarment

Suspension and debarment, under FAR subpart 9.4, exclude a contractor from new federal awards governmentwide, recorded in SAM exclusions. Debarment generally runs up to three years after notice and proceedings; suspension is an interim measure imposed on adequate evidence pending investigation.

Suspension and debarment, under FAR subpart 9.4, exclude a contractor from new federal awards governmentwide, recorded in SAM exclusions. Debarment generally runs up to three years after notice and proceedings; suspension is an interim measure imposed on adequate evidence pending investigation.

The Part 9 model deviation, adopted at GSA as class deviation RFO-2025-09 (issued August 19, 2025, effective November 3, 2025), retains subpart 9.4 with plain-language edits while trimming responsibility and qualification coverage elsewhere in the part; Part 9 is not among the June 23, 2026 first-batch proposed rules. (verified September 14, 2026)

System for Award Management (SAM) Registration

SAM registration is the System for Award Management record an entity must hold to win federal contracts. FAR 52.204-7 requires registration when submitting an offer and again at award; FAR 52.204-13 requires maintaining it through final payment.

SAM registration is the System for Award Management record an entity must hold to win federal contracts. FAR 52.204-7 requires registration when submitting an offer and again at award; FAR 52.204-13 requires maintaining it through final payment.

The Part 4 model deviation rebuilds registration policy at 4.203 and SAM maintenance at 4.304, and Part 4 is in the June 23, 2026 first-batch proposed rules covering Parts 1, 2, 4, 33, 39, 40, and 53.

Technical Data Rights (Unlimited, Government Purpose, Limited)

Technical data rights are the standard license categories DoD receives in noncommercial technical data under DFARS 252.227-7013, set by funding source: unlimited rights for government-funded development, government purpose rights for mixed funding, and limited rights for development at exclusively private expense.

Technical data rights are the standard license categories DoD receives in noncommercial technical data under DFARS 252.227-7013, set by funding source: unlimited rights for government-funded development, government purpose rights for mixed funding, and limited rights for development at exclusively private expense.

DoD's RFO class deviation 2026-O0036 restructured DFARS Part 227 and consolidated 252.227-7013 and -7014 into a single noncommercial clause, 252.227-7989, while the funding-based rights framework stays anchored in 10 U.S.C. 3771, so check which clause set a given solicitation carries.

Termination for Convenience (T4C)

Termination for convenience is the government's contractual right, exercised by written notice under a FAR Part 49 clause such as 52.249-2, to end all or part of a contract when that is in the government's interest. The contractor is paid for work done plus reasonable profit on it, never anticipatory profits.

Termination for convenience is the government's contractual right, exercised by written notice under a FAR Part 49 clause such as 52.249-2, to end all or part of a contract when that is in the government's interest. The contractor is paid for work done plus reasonable profit on it, never anticipatory profits.

The Part 49 model deviation keeps the one-year settlement proposal window, but the proposed rule for Parts 3 and 49 (FAR Case 2026-007, published June 23, 2026) would cut it to 90 days, shorten inventory schedules to 60 days, and make settlement audits discretionary for the TCO; DoD adopted the model text through class deviation 2026-O0010 effective February 1, 2026.

Termination for Default (T4D)

Termination for default is the government's contractual remedy, under FAR Subpart 49.4 and the Default clause at 52.249-8, for a contractor's failure to deliver on time, make progress, or perform another contract provision. The contractor is paid nothing for undelivered work and owes the government's excess reprocurement costs.

Termination for default is the government's contractual remedy, under FAR Subpart 49.4 and the Default clause at 52.249-8, for a contractor's failure to deliver on time, make progress, or perform another contract provision. The contractor is paid nothing for undelivered work and owes the government's excess reprocurement costs.

The Part 49 model deviation carries the default framework over intact, with the 10-day cure notice, show cause notice, excess reprocurement cost recovery, and convenience conversion for excusable failures all retained; the proposed rule for Parts 3 and 49 (FAR Case 2026-007, published June 23, 2026) describes its subpart 49.4 edits as clarifying when a cure notice applies and when a show cause notice is practicable, and DoD adopted the model text through class deviation 2026-O0010, issued December 18, 2025 and effective February 1, 2026.

Time-and-Materials (T&M)

A time-and-materials (T&M) contract pays fixed hourly labor rates — wages, overhead, G&A, and profit built in — plus materials at actual cost. FAR 16.601 permits it only when the extent or duration of the work cannot be estimated accurately at award.

A time-and-materials (T&M) contract pays fixed hourly labor rates — wages, overhead, G&A, and profit built in — plus materials at actual cost. FAR 16.601 permits it only when the extent or duration of the work cannot be estimated accurately at award.

The Part 16 model deviation retains T&M coverage in subpart 16.6, and section 16.104 (Executive Order 14402) pulls T&M and labor-hour awards into the written-justification and approval regime for other-than-fixed-price contracts.

Unauthorized Commitment and Ratification

An unauthorized commitment is an agreement that does not bind the government solely because the person who made it lacked contracting authority. Ratification is the approval of that commitment, under FAR 1.602-3, by an official with authority to do so, which lets the vendor be paid.

An unauthorized commitment is an agreement that does not bind the government solely because the person who made it lacked contracting authority. Ratification is the approval of that commitment, under FAR 1.602-3, by an official with authority to do so, which lets the vendor be paid.

The Part 1 model deviation moves ratification from 1.602-3 to 1.405 in a rewritten Subpart 1.4, keeps the definitions, the head of the contracting activity as ratifying official, the chief of the contracting office delegation floor, and the acceptance, authority, propriety, price, legal concurrence, and funds tests, drops the catch-all condition on other agency-procedure limitations, and routes nonratifiable cases to 31 U.S.C. 3702 or Subpart 50.1; the proposed rule for Parts 1, 2, 4, 33, 39, 40, and 53 (FAR Case 2026-001, published June 23, 2026) keeps the 1.405 placement, and DoD adopted the model text through class deviation 2026-O0002 effective February 1, 2026.

Undefinitized Contract Action (UCA)

An undefinitized contract action (UCA) is a DoD contract action, commonly a letter contract, under which performance begins before terms, specifications, or price are agreed. DFARS 217.74 caps obligations at 50 to 75 percent of the not-to-exceed price until definitization.

An undefinitized contract action (UCA) is a DoD contract action, commonly a letter contract, under which performance begins before terms, specifications, or price are agreed. DFARS 217.74 caps obligations at 50 to 75 percent of the not-to-exceed price until definitization.

UCA policy lives in the DFARS and title 10 rather than the FAR, so the overhaul does not rewrite it directly; the RFO Part 16 model deviation retains letter contract coverage at 16.603, so the companion citation carries over.

Uniform Contract Format (UCF)

The uniform contract format is the standard solicitation and contract structure in FAR 15.204-1: four parts broken into Sections A through M, from the award form in Section A to the evaluation factors in Section M. Negotiated and sealed-bid acquisitions both build on it.

The uniform contract format is the standard solicitation and contract structure in FAR 15.204-1: four parts broken into Sections A through M, from the award form in Section A to the evaluation factors in Section M. Negotiated and sealed-bid acquisitions both build on it.

The Part 15 model deviation (posted September 30, 2025) relocates the UCF from 15.204 to 15.109, keeps all four parts and Sections A through M, and softens the requirement from shall to should; DoD conformed DFARS 215 through class deviation 2026-O0048 (issued March 5, 2026). Part 15 is not among the June 23, 2026 first-batch proposed rules but is in the second batch (FAR Case 2026-003, published September 18, 2026; comments due October 19, 2026). (verified October 2, 2026)

Unique Entity Identifier (UEI)

The Unique Entity Identifier (UEI) is the 12-character alphanumeric ID that SAM.gov generates for every entity doing business with the federal government. Owned and issued by the government, it replaced the proprietary DUNS number on April 4, 2022.

The Unique Entity Identifier (UEI) is the 12-character alphanumeric ID that SAM.gov generates for every entity doing business with the federal government. Owned and issued by the government, it replaced the proprietary DUNS number on April 4, 2022.

The Part 4 model deviation keeps the identifier under contractor identification at 4.305 — UEI and CAGE code maintained for the life of the contract, changes reported within 30 days — and Part 4 is in the June 23, 2026 first-batch proposed rules.

Unsolicited Proposal

An unsolicited proposal is a written offer submitted on a firm's own initiative, without a government solicitation, to obtain a contract. Under FAR subpart 15.6 it must be innovative, unique, and independently developed; favorable evaluation alone does not justify award without competition.

An unsolicited proposal is a written offer submitted on a firm's own initiative, without a government solicitation, to obtain a contract. Under FAR subpart 15.6 it must be innovative, unique, and independently developed; favorable evaluation alone does not justify award without competition.

The Part 15 model deviation (posted September 30, 2025) renumbers unsolicited proposals from subpart 15.6 to subpart 15.5 (sections 15.500-15.506) with the validity criteria and sole-source path intact; GSA adopted the deviated part as class deviation RFO-2025-15 effective November 3, 2025, and DoD as class deviation 2026-O0048 (issued March 5, 2026). Part 15 is not among the June 23, 2026 first-batch proposed rules, so published subpart 15.6 remains the baseline absent an agency deviation. (verified September 25, 2026)

Wide Area Workflow (WAWF)

Wide Area Workflow (WAWF) is the DoD system for electronic submission and processing of contractor payment requests and receiving reports, required by 10 U.S.C. 4601 and DFARS subpart 232.70 and operating as a module of the Procurement Integrated Enterprise Environment (PIEE).

Wide Area Workflow (WAWF) is the DoD system for electronic submission and processing of contractor payment requests and receiving reports, required by 10 U.S.C. 4601 and DFARS subpart 232.70 and operating as a module of the Procurement Integrated Enterprise Environment (PIEE).

WAWF is DFARS territory, so the overhaul touches it only at the edges: the FAR Part 32 model deviation (released September 30, 2025) restructures contract financing while DFARS subpart 232.70 remains in force, and DoD conformed DFARS 232 to the overhaul through class deviation 2026-O0022 (dated December 18, 2025). Part 32 is not among the June 23, 2026 first-batch proposed rules. (verified September 21, 2026)

Women-Owned Small Business Program (WOSB/EDWOSB)

The Women-Owned Small Business (WOSB) program, created by section 8(m) of the Small Business Act, lets contracting officers set aside contracts, and make limited sole-source awards, to SBA-certified women-owned small businesses in NAICS codes where SBA finds women-owned firms underrepresented.

The Women-Owned Small Business (WOSB) program, created by section 8(m) of the Small Business Act, lets contracting officers set aside contracts, and make limited sole-source awards, to SBA-certified women-owned small businesses in NAICS codes where SBA finds women-owned firms underrepresented.

The Part 19 model deviation reorganizes small business coverage into presolicitation, evaluation-and-award, and postaward subparts; Part 19 is not in the June 2026 first-batch proposed rules, so published subpart 19.15 still controls absent an agency deviation.