Wide Area Workflow (WAWF)

Wide Area Workflow (WAWF) is the DoD system for electronic submission and processing of contractor payment requests and receiving reports, required by 10 U.S.C. 4601 and DFARS subpart 232.70 and operating as a module of the Procurement Integrated Enterprise Environment (PIEE).

DFARS 232.7002 requires payment requests and receiving reports in electronic form, and WAWF is the method — facsimile, email, and scanned documents do not qualify (DFARS subpart 232.70). The system runs inside PIEE, the DLA-managed platform that hosts DoD's enterprise procurement applications.

Two clauses drive it. DFARS 252.232-7003 mandates electronic submission through WAWF; 252.232-7006 supplies the mechanics — registration, the WAWF document type (cost voucher, invoice and receiving report, performance-based payment request), and the routing table of DoDAACs (pay official, issue-by, admin, inspect-by, accept-by) each submission carries.

The exceptions at 232.7002(a) are narrow: security-classified information, infeasibility, DoD receiving inability, a CO-approved written request, purchase-card payment. An invoice mailed or emailed to the payment office has not been submitted at all, and a request built on the wrong document type or DoDAAC never reaches the official who must accept it.

Regulatory Reference

10 U.S.C. 4601; DFARS Subpart 232.70; DFARS 252.232-7003; DFARS 252.232-7006

RFO Status

WAWF is DFARS territory, so the overhaul touches it only at the edges: the FAR Part 32 model deviation (released September 30, 2025) restructures contract financing while DFARS subpart 232.70 remains in force, and DoD conformed DFARS 232 to the overhaul through class deviation 2026-O0022 (dated December 18, 2025). Part 32 is not among the June 23, 2026 first-batch proposed rules. (verified September 21, 2026)

Category

Processes & Methods

How AcqBot Helps

AcqBot drafts the 252.232-7006 payment instructions during contract writing — document type and the full routing DoDAAC table — and checks them against the pay office and admin office on the award, the step that decides whether the contractor's first invoice routes or stalls.