Unauthorized Commitment and Ratification
An unauthorized commitment is an agreement that does not bind the government solely because the person who made it lacked contracting authority. Ratification is the approval of that commitment, under FAR 1.602-3, by an official with authority to do so, which lets the vendor be paid.
FAR 1.602-1 puts contracting authority in the warrant, and 1.602-3 handles what happens when a program manager or COR orders work anyway. The vendor performs and invoices, and no contract exists. FAR 1.602-3(b) tells agencies to ratify rather than send the vendor to GAO, while insisting the procedure not encourage the practice.
Ratification authority sits with the head of the contracting activity unless the agency designates a higher official, and can be delegated no lower than the chief of the contracting office. Every condition in 1.602-3(c) must hold: the government accepted the work or received a benefit, the ratifying official could have entered the commitment when it was made, the contract would otherwise have been proper, the contracting officer finds the price fair and reasonable and recommends payment, legal counsel concurs unless agency procedures waive that step, funds were available at the time of the commitment, and agency procedures are followed.
The funds test is where packages die: availability is measured when the commitment was made, not when the file reaches the ratifying official. A case that fails any condition goes to 1.602-3(d): GAO claims procedures or extraordinary relief under FAR Subpart 50.1, and the FAR says to get legal advice first.
Regulatory Reference
FAR 1.602-1; FAR 1.602-3; FAR Subpart 50.1; FAR 1.405 (RFO model deviation text)
RFO Status
The Part 1 model deviation moves ratification from 1.602-3 to 1.405 in a rewritten Subpart 1.4, keeps the definitions, the head of the contracting activity as ratifying official, the chief of the contracting office delegation floor, and the acceptance, authority, propriety, price, legal concurrence, and funds tests, drops the catch-all condition on other agency-procedure limitations, and routes nonratifiable cases to 31 U.S.C. 3702 or Subpart 50.1; the proposed rule for Parts 1, 2, 4, 33, 39, 40, and 53 (FAR Case 2026-001, published June 23, 2026) keeps the 1.405 placement, and DoD adopted the model text through class deviation 2026-O0002 effective February 1, 2026.
Category
Processes & Methods
How AcqBot Helps
AcqBot assembles the ratification file from the facts the requiring office supplies: it drafts the statement of circumstances, walks each 1.602-3(c) condition with the evidence attached, flags a funds availability problem before the package goes to counsel, and routes the determination to the official whose delegation covers it.
Related glossary entries
Sources Sought Notice
A Sources Sought Notice is a pre-solicitation announcement, typically posted to SAM.gov, asking companies to identify their interest and capability to perform a prospective requirement — primarily used as market research to shape competition and set-aside decisions.
Request for Information (RFI)
A Request for Information (RFI) is a formal market research instrument used to gather industry input on capabilities, approaches, pricing structures, or draft requirements when the government is not yet ready to solicit — responses are voluntary and non-binding.
Lowest Price Technically Acceptable (LPTA)
Lowest Price Technically Acceptable (LPTA) is a source selection process that awards to the lowest-priced offeror whose proposal meets minimum acceptability standards — no credit is given for exceeding requirements, and tradeoffs between price and quality are not permitted.
Best-Value Tradeoff
The best-value tradeoff process permits award to other than the lowest-priced or highest-rated offeror when the source selection authority documents that the superior proposal's benefits are worth its price premium, or that a cheaper proposal's savings outweigh its weaknesses.