Responsibility Determination
A responsibility determination is the contracting officer's affirmative finding, required by FAR 9.103 before any award, that a prospective contractor meets the FAR 9.104-1 standards: financial resources, delivery capability, performance record, integrity, organization and skills, facilities, and legal eligibility.
No award happens without one. FAR 9.103 directs that purchases be made from and contracts awarded to responsible prospective contractors only, and in the absence of information clearly indicating that the offeror is responsible, the contracting officer shall determine it nonresponsible (FAR 9.103(b)). The burden sits on the offeror; a thin file loses.
The general standards at 9.104-1 run from adequate financial resources through delivery capability, satisfactory performance record, integrity and business ethics, organization and technical skills, facilities, and legal eligibility. Resources, skills, and facilities count if obtainable, not only in hand; lack of a performance history alone cannot sink an offeror. The award signature itself constitutes the determination, and nonresponsibility must be documented under 9.105-2.
For a small business, nonresponsibility is not the contracting officer's last word. FAR 9.104-3(d)(1) requires referral to SBA, which decides whether to issue a Certificate of Competency, and 19.602-1 requires the officer to withhold award while SBA decides.
Regulatory Reference
FAR 9.103; FAR 9.104-1; FAR 9.104-3(d); FAR 9.105-2; FAR 19.602-1
RFO Status
The Part 9 model deviation (released August 21, 2025; updated April 20, 2026) keeps responsibility in subpart 9.1 with the 9.104-1 general standards substantively intact; GSA adopted it as class deviation RFO-2025-09 effective November 3, 2025, and DoD as class deviation 2026-O0042 (issued February 3, 2026). Part 9 is not among the June 23, 2026 first-batch proposed rules, so published subpart 9.1 remains the baseline absent an agency deviation. (verified September 23, 2026)
Category
Processes & Methods
How AcqBot Helps
AcqBot assembles the responsibility file before award: it gathers the exclusion and FAPIIS records the contract file must reflect under 9.105-2(b), maps the evidence to each 9.104-1 standard, drafts the documentation a nonresponsibility finding requires, and flags a small business finding for the mandatory SBA referral before the file closes.
Related glossary entries
Sources Sought Notice
A Sources Sought Notice is a pre-solicitation announcement, typically posted to SAM.gov, asking companies to identify their interest and capability to perform a prospective requirement — primarily used as market research to shape competition and set-aside decisions.
Request for Information (RFI)
A Request for Information (RFI) is a formal market research instrument used to gather industry input on capabilities, approaches, pricing structures, or draft requirements when the government is not yet ready to solicit — responses are voluntary and non-binding.
Lowest Price Technically Acceptable (LPTA)
Lowest Price Technically Acceptable (LPTA) is a source selection process that awards to the lowest-priced offeror whose proposal meets minimum acceptability standards — no credit is given for exceeding requirements, and tradeoffs between price and quality are not permitted.
Best-Value Tradeoff
The best-value tradeoff process permits award to other than the lowest-priced or highest-rated offeror when the source selection authority documents that the superior proposal's benefits are worth its price premium, or that a cheaper proposal's savings outweigh its weaknesses.