Liquidated Damages

Liquidated damages are preset amounts a contractor owes for late delivery or performance, used under FAR subpart 11.5 when timeliness matters, actual damage would be hard to prove, and the rate reasonably forecasts the Government's probable loss rather than punishing delay.

FAR 11.501 permits a liquidated damages clause only when two things are true: timely delivery or performance matters enough that the Government can expect to suffer damage from delinquency, and the extent of that damage would be difficult or impossible to estimate or prove. The rate must be a reasonable forecast of just compensation — maximums, capped periods, and graduated rates are allowed; punishment is not.

The clause and its rate go in the solicitation. For construction, FAR 11.502 builds the daily rate from estimated inspection costs plus other delay costs, such as renting substitute space. FAR 52.211-11 covers fixed-price supplies, services, and R&D, 52.211-12 construction; DFARS 211.503 makes 52.211-12 mandatory in DoD construction over $900,000 unless the contract is cost-plus-fixed-fee or the contractor cannot control the pace of the work.

Rates copied from a prior contract with no damage estimate behind them are the standing failure: an unsupported figure reads as punishment, which FAR 11.501 forbids. The contracting officer also owes mitigation — once default termination is in view, the regulation expects prompt action on performance or reprocurement.

Regulatory Reference

FAR 11.501; FAR 11.502; FAR 52.211-11; FAR 52.211-12; DFARS 211.503

RFO Status

The Part 11 model deviation (posted June 18, 2025; informal feedback closed August 4, 2025) retains liquidated damages coverage, renumbered from subpart 11.5 to 11.4; DoD adopted the rewrite through class deviation 2026-O0013 (effective February 1, 2026), covering DFARS 211. Part 11 appears in neither the first batch of proposed rules published June 23, 2026 (beginning at 91 FR 37550) nor the second batch published September 18, 2026 (beginning at 91 FR 59406), so published FAR subpart 11.5 and the 52.211-11 and 52.211-12 clauses remain the citations absent an agency deviation. (verified October 6, 2026)

Category

Regulations & Policy

How AcqBot Helps

AcqBot assembles the damage estimate FAR 11.502 expects behind the daily rate, writes the support into the contract file, and tracks accrual, excusable delay, and time extensions once delivery slips.