Government-Furnished Property (GFP)

Government-furnished property is property in the possession of, or directly acquired by, the government and subsequently furnished to a contractor for contract performance. FAR Part 45 sets the policy; the Government Property clause at FAR 52.245-1 carries the contractor's duties.

The default at FAR 45.102 is that contractors furnish everything needed to perform, so providing government property takes an affirmative judgment that doing so serves the government's interest without substantially increasing its assumption of risk. GFP is property the government possesses or directly acquires and then furnishes; property the contractor buys with title vesting in the government is contractor-acquired property, a separate category with its own rules.

The 52.245-1 clause carries the contractor's obligations: a system of internal controls to manage, use, preserve, and maintain government property, with customary commercial practices allowed where appropriate. On cost-reimbursement and time-and-materials work the government generally assumes the risk of loss, though the contracting officer can revoke that assumption when the property management practices are noncompliant. DoD requires GFP to be listed on a standard attachment under DFARS 245.103-72.

Unlisted property is the recurring failure. Gear reaches a contractor informally, never makes the contract's GFP attachment, and there is then no baseline for accountability, liability, or disposition. Late or unsuitable GFP cuts the other way: under 52.245-1(d)(2), the contracting officer considers an equitable adjustment on the contractor's timely written request.

Regulatory Reference

FAR Part 45; FAR 45.102; FAR 52.245-1; DFARS 245.103-72

RFO Status

The Part 45 model deviation, released September 11, 2025, keeps the subpart structure and the 52.245-1 clause family while directing agencies to accept contractors' existing property systems and voluntary consensus standards rather than imposing separate ones; Part 45 was not in the June 2026 first-wave proposed rules.

Category

Processes & Methods

How AcqBot Helps

AcqBot drafts the FAR 45.102 property determination, builds the GFP attachment from the requirement's line items, and checks that 52.245-1 lands in the clause set whenever the contract will furnish property, so the listing and the clause never travel separately.