Contractor Team Arrangement (CTA)
A contractor team arrangement is either a partnership or joint venture formed to act as a potential prime contractor, or a prime contractor's agreement to use designated subcontractors on a specific contract or program — both recognized under FAR subpart 9.6.
FAR 9.601 defines two forms: companies that form a partnership or joint venture to compete as the prime, and a prime that agrees to place designated subcontractors on a particular contract or program. Teams combine complementary capabilities, with subpart 9.6 pointing to complex research and development as the natural habitat. They normally form before the offer, though they can form as late as after award.
Recognition carries a condition: the Government respects the arrangement when the relationship is fully disclosed in the offer, or before the arrangement takes effect if entered later (FAR 9.603). FAR 9.604 keeps the Government's hand free on consent to subcontracts, responsibility determinations, and rights in data, and holds the prime fully responsible for performance. Privity runs to the prime alone.
The forms diverge at size. A joint venture is measured under 13 CFR 121.103(h): partners aggregate unless every member is small or the venture holds an SBA-approved mentor-protégé exception. A prime-sub team instead works the limitations-on-subcontracting math. Picking the form before checking those rules is how teams disqualify themselves.
Regulatory Reference
FAR 9.601; FAR 9.602; FAR 9.603; FAR 9.604; 13 CFR 121.103(h)
RFO Status
The Part 9 model deviation (posted August 21, 2025; informal feedback closed October 6, 2025) deletes subpart 9.6 from the deviated text, leaving team arrangements lawful but no longer addressed in regulation; DoD adopted the rewrite through class deviation 2026-O0042 (effective February 17, 2026), covering DFARS 209. Part 9 is in the second batch of proposed rules published September 18, 2026 (FAR Case 2026-011, beginning at 91 FR 59584; comments close October 19, 2026), which likewise proposes removing subpart 9.6 as unnecessary. Until a final rule issues, published FAR 9.601 through 9.604 remain the codified citations — at agencies operating under the deviation, there is no subpart 9.6 to cite. (verified October 6, 2026)
Category
Processes & Methods
How AcqBot Helps
AcqBot checks a teamed offer against the FAR 9.603 disclosure condition, screens joint ventures for 13 CFR 121.103(h) affiliation and mentor-protégé status, and drafts the responsibility and consent-to-subcontract analysis the contract file needs before award.
Related glossary entries
Sources Sought Notice
A Sources Sought Notice is a pre-solicitation announcement, typically posted to SAM.gov, asking companies to identify their interest and capability to perform a prospective requirement — primarily used as market research to shape competition and set-aside decisions.
Request for Information (RFI)
A Request for Information (RFI) is a formal market research instrument used to gather industry input on capabilities, approaches, pricing structures, or draft requirements when the government is not yet ready to solicit — responses are voluntary and non-binding.
Lowest Price Technically Acceptable (LPTA)
Lowest Price Technically Acceptable (LPTA) is a source selection process that awards to the lowest-priced offeror whose proposal meets minimum acceptability standards — no credit is given for exceeding requirements, and tradeoffs between price and quality are not permitted.
Best-Value Tradeoff
The best-value tradeoff process permits award to other than the lowest-priced or highest-rated offeror when the source selection authority documents that the superior proposal's benefits are worth its price premium, or that a cheaper proposal's savings outweigh its weaknesses.